For landowners with sites suited to battery storage.
We discuss both purchase and lease.
If the location fits, we propose how to put it to use.
Even if your land does not match below, please get in touch first.
The nearer to a substation or transmission line, the lower the connection cost — and the higher the site's value.
From around 1,000 m² for an HV 2 MW-class site. Regular shapes are preferred, but we assess case by case.
We check zoning, road access and surroundings, including the outlook for permits.
For landowners interested in selling or leasing land for battery storage.
We review the location and propose how to use it.
s@scix.co.jp | +81 3 6403 4095