The figures, charts and tables in our articles may be used in articles, documents and internal reviews as long as you credit the source. This page gathers how to cite, what you may use, downloads of charts and data, embed code for the charts, and the contact for interviews and contributions.
The Knowledge section of ScienceX is written from materials published by the Ministry of Economy, Trade and Industry, the Agency for Natural Resources and Energy, OCCTO and EPRX, and from documents of the projects we actually handle. We have set it out in a form that is easy to cite for media, researchers and anyone preparing internal materials.
You may use the following without contacting us for permission, as long as you credit the source.
Please refrain from the following.
Please give the article title, the URL and the date you accessed it. On the web, please add a link.
If you reproduce a chart or table as it is, please place the same source line beneath it. The form “Source: Science X Inc., “Article title”, URL (accessed YYYY-MM-DD)” is fine.
Balancing Market Results — 9 Power Areas × 5 Products ── article. The tables as CSV. (The file names are in Japanese, as in the Japanese page.)
Balancing Market Price Cap Falls to ¥10 — What Disappears ── article. Two charts of the estimate (PNG, 2x resolution).

Fig. 1 — ΔkW payments that disappear under the ¥10 cap (annualized, by area, central estimate)Tokyo is where the money is largest; Tohoku offline is where the share is largest. ScienceX estimate. Open PNG

Fig. 2 — Monthly average national contract price for primary offline (by location of the resource; August through the 18th)Even with the July notice of the ¥10 cap, prices fell below the cap before it applied. ScienceX tabulation. Open PNG
What Does It Cost to Buy a Battery Storage Plant in Japan? ── article. Six charts (PNG, 2x resolution; ScienceX observation).

Fig. 1 | Asking-price band and disclosed acquisition pricesThe band is the range and the vertical bar is the median (one value per project; high-voltage, 2 MW class; excl. tax; ScienceX observation). The gold dots are acquisition prices from timely disclosures, and all three sit inside the band. Open PNG

Fig. 2 | Price staircase (median asking price; high-voltage, 2 MW class; excl. tax; ScienceX observation)Stack the national-average construction cost from a government study group (¥68,000/kWh × 8 MWh = ¥540 million; excludes grid-connection contribution and subsidies) on ¥120 million for the rights and you get ¥660 million, almost the same as the ¥670 million median for turnkey handover. A project already connected adds ¥80 million on top of the turnkey price. Open PNG

Fig. 3 | Asking prices for turnkey handover (including already connected projects)Dots are medians and lines are ranges. Left: by service area. Right: by connection timing. The gold line is the overall median of ¥670 million. Hokuriku has 3 projects. Open PNG

Fig. 4 | Asking price per kW for extra-high-voltage rights (¥10,000/kW; median; excl. tax; ScienceX observation)The unit price moves with the connection fiscal year. Counts are small, so read it as a band. Open PNG

Fig. 5 | Conditions that separate the top of the band from the bottomWords attached to the offers were counted and ranked by frequency (high-voltage turnkey handover and rights asking prices). Open PNG

Fig. 6 | Deadlines that matter to sellersTop: a clock for each project, counted from the date of the grid-connection study reply. Bottom: the regulatory calendar. The basis is in the table. Open PNG
Number tables are also found in the market data page (in Japanese; the number, scale and expected connection timing of projects on sale by service area, updated every morning) and in the construction cost article. If you need an excerpt of a table or another cut (by area, by product and so on), please use the contact below.
Paste the code below as it is, and the chart appears with a link to the original article and the source line. The charts are served from our server, so any replacement or correction is reflected automatically.
Fig. 1 — ΔkW payments that disappear under the ¥10 cap (annualized, by area, central estimate)
<a href="https://www.scix.co.jp/en/column-price-cap"><img src="https://www.scix.co.jp/img/press/price-cap-fig1.png" alt="Fig. 1 — ΔkW payments that disappear under the ¥10 cap (annualized, by area, central estimate)" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “Balancing Market Price Cap Falls to ¥10 — What Disappears”, <a href="https://www.scix.co.jp/en/column-price-cap">https://www.scix.co.jp/en/column-price-cap</a></small>
Fig. 2 — Monthly average national contract price for primary offline (by location of the resource; August through the 18th)
<a href="https://www.scix.co.jp/en/column-price-cap"><img src="https://www.scix.co.jp/img/press/price-cap-fig2.png" alt="Fig. 2 — Monthly average national contract price for primary offline (by location of the resource; August through the 18th)" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “Balancing Market Price Cap Falls to ¥10 — What Disappears”, <a href="https://www.scix.co.jp/en/column-price-cap">https://www.scix.co.jp/en/column-price-cap</a></small>
Fig. 1 | Asking-price band and disclosed acquisition prices
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig1.png" alt="Fig. 1 | Asking-price band and disclosed acquisition prices" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
Fig. 2 | Price staircase (median asking price; high-voltage, 2 MW class; excl. tax; ScienceX observation)
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig2.png" alt="Fig. 2 | Price staircase (median asking price; high-voltage, 2 MW class; excl. tax; ScienceX observation)" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
Fig. 3 | Asking prices for turnkey handover (including already connected projects)
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig3.png" alt="Fig. 3 | Asking prices for turnkey handover (including already connected projects)" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
Fig. 4 | Asking price per kW for extra-high-voltage rights (¥10,000/kW; median; excl. tax; ScienceX observation)
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig4.png" alt="Fig. 4 | Asking price per kW for extra-high-voltage rights (¥10,000/kW; median; excl. tax; ScienceX observation)" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
Fig. 5 | Conditions that separate the top of the band from the bottom
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig5.png" alt="Fig. 5 | Conditions that separate the top of the band from the bottom" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
Fig. 6 | Deadlines that matter to sellers
<a href="https://www.scix.co.jp/en/column-project-price"><img src="https://www.scix.co.jp/img/press/project-price-fig6.png" alt="Fig. 6 | Deadlines that matter to sellers" style="max-width:100%;height:auto"></a><br><small>Source: Science X Inc., “What Does It Cost to Buy a Battery Storage Plant in Japan?”, <a href="https://www.scix.co.jp/en/column-project-price">https://www.scix.co.jp/en/column-project-price</a></small>
We respond to the following.
Science X Inc. Shinya Nakashima, Ph.D. (Eng.), Representative Director
MAIL: s@scix.co.jp / TEL: 03-6691-3484
| Company name | Science X Inc. (サイエンスエックス株式会社) |
|---|---|
| Address | BIZMARKS Nihonbashi Kayabacho, 8-2 Nihonbashi Koamicho, Chuo-ku, Tokyo 103-0016 |
| Representative | Shinya Nakashima, Ph.D. (Eng.), Representative Director |
| Business | Buying and selling of grid-scale battery storage projects and rights, development, and technical due diligence |
| Logo | Logo (white, transparent PNG; for use on navy or dark backgrounds) / Square mark (PNG) |
| Author photo | Shinya Nakashima (PNG). You may use it to introduce the supervisor of an article |