"Grid-scale batteries" (large batteries connected to the grid that store electricity and release it again) earn money by selling the "capacity" to fix surpluses and shortages of electricity, and from the price difference as electricity prices change through the day. These notes use published figures and our own records to show this month's movements in figures and tables. This is a back issue, produced retroactively in November 2026. The grid connection study totals are as of the date we produced it (October 19, 2026).
Science X Inc. · Published November 5, 2026 · A4, 13 pages
A battery storage plant (grid-scale battery storage) earns revenue from three markets. ① The balancing market (EPRX) is the market where you sell grid operators the "capacity" to correct surpluses or shortages of electricity. ② Wholesale electricity (JEPX) is the market where you buy and store electricity when it is cheap and sell it when it is expensive. ③ The capacity market (OCCTO) is the market where the country buys future electricity supply capacity in advance. These notes present figures for these three markets in that order. The ①, ② or ③ at the start of each section title shows which market it covers.

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).
We picked three of this month's movements from the figures of the three markets.
The balancing market is where grid operators buy, every 30 minutes, the "capacity" to correct surpluses or shortages of electricity. Products are divided by how quickly output changes after a dispatch instruction. Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve has two categories: "online", connected to the grid operator by a dedicated line, and "offline", which runs on the simplified dispatch system without a dedicated line. They are tendered and traded separately, so we show them separately. A Composite product is a bid that offers several products together. Prices are set in yen per 1 kW of available capacity per 30 minutes. kW is a unit of power capacity, not to be confused with kWh, which measures the amount of electricity. One 30-minute trading unit is called a "slot". The figure shows the range of winning prices by area (by the area where the power source is located). The thin line runs from the cheapest to the most expensive winning bid in the month. The thick band is the price range that covers 8 out of 10 slots with winning bids. The dot is the average winning price. Nationwide figures are in the table in the "Market figures" section.
By area, the highest average winning price in the balancing market was 14.66 yen/kW per 30 min for Primary reserve (offline) in Tohoku, and the lowest was 0.30 yen/kW per 30 min for Tertiary reserve 2 in Shikoku.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
| Product | From instruction to output change | Duration |
|---|---|---|
| Primary reserve (online) | Within 10 seconds | 5 minutes or more |
| Primary reserve (offline) | Within 10 seconds | 5 minutes or more |
| Secondary reserve 1 | Within 5 minutes | 30 minutes |
| Secondary reserve 2 | Within 5 minutes | 30 minutes |
| Tertiary reserve 1 | Within 15 minutes | 30 minutes |
| Tertiary reserve 2 | Within 60 minutes | 30 minutes |
| Composite product | Requirements of the combined products | Requirements of the combined products |
The award rate is the share of bid volume that won. The higher it is, the more easily bids win. The figure shows the award rate for each product by time of day (every 30 minutes), for each grid area (the area where the power source is located). Where a line breaks, there were no bids at that time.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
Primary reserve is the fastest product, changing output within 10 seconds of an instruction, and batteries are often used for it. The left shows the online category, the right the offline category. The bars show the bid-to-requirement ratio (bid volume ÷ volume tendered by grid operators). Above 100%, more bids came in than were tendered, and some bids lose. The bars rise both when bids increase and when the tendered volume falls. The line is the average winning price. These are the monthly figures we have, from April 2025.
In the balancing market, Primary reserve (online) had a bid-to-requirement ratio of 106.8% this month, above 100% for the first time, and an average winning price of 4.00 yen/kW per 30 min. Its tendered volume was 3,066.1 MW in April 2025 and 1,388.0 MW this month. Primary reserve (offline) had a bid-to-requirement ratio of 51.5% and an average winning price of 11.71 yen/kW per 30 min this month. Its tendered volume was 1,122.5 MW in April 2025 and 497.1 MW this month.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
These are average winning prices by product from April 2025 (monthly averages weighted by winning volume). From March 14, 2026, Primary to Tertiary 1 and the Composite product moved from trading in 3-hour blocks to trading every 30 minutes (Tertiary 2 was already traded every 30 minutes).
In the balancing market, the average winning price (yen/kW per 30 min) for Primary reserve (online) was 2.89 yen in April 2025 and 4.00 yen this month. The highest was 4.90 yen in February 2026. For Tertiary reserve 2 it was 1.12 yen in April 2025 and 2.45 yen this month. The highest was 4.18 yen in May 2026.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
These are average winning prices by product for each hour in June 2026 (1st to 30th).
For Primary reserve (online) in the balancing market, the average winning price was highest around 18:00 at 4.62 yen/kW per 30 min and lowest around 2:00 at 3.20 yen/kW per 30 min.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
The figure shows the share of winning volume held by batteries. The table compares the average winning price of the volume won by batteries with the average winning price of the whole product.
For Primary reserve (online) in the balancing market, batteries held 23.5%. The average winning price of the volume won by batteries was 9.52 yen/kW per 30 min (4.00 yen/kW per 30 min overall).

Source: Trading results (preliminary figures) by power source type published by the Electric Power Reserve Exchange (EPRX). Our calculation.
| Product | Volume won by batteries (yen/kW per 30 min) | Whole product (yen/kW per 30 min) |
|---|---|---|
| Primary reserve (online) | 9.52 | 4.00 |
| Primary reserve (offline) | 11.70 | 11.71 |
| Secondary reserve 1 | 10.67 | 2.55 |
| Secondary reserve 2 | 11.41 | 2.23 |
| Tertiary reserve 1 | 11.08 | 2.11 |
| Tertiary reserve 2 | 41.95 | 2.45 |
| Composite product | 9.51 | 2.67 |
Both are averages weighted by winning volume (June 2026, preliminary, nationwide). For Tertiary reserve 2, batteries won only 0.3% of the volume, and most of it was in high-priced slots, so their average comes out high.
We ranked the month's 30-minute slots with winning bids by revenue (average winning price × winning volume, nationwide), from highest to lowest. For each product, we plotted what % of the month's revenue the top slots account for. The more a curve bulges above the dotted line, the more revenue is concentrated in a few slots. Tertiary reserve 2 is a product that covers errors in forecasting renewable output caused by the weather. Its price is low in most slots and high in a very few.
In the balancing market, the top 10% of slots accounted for 47.9% of the month's revenue for Tertiary reserve 2 and 14.4% for Primary reserve (online). For the top 1%, the figures were 7.3% and 1.7%, in the same order.

Source: Trading results (preliminary figures) published by the Electric Power Reserve Exchange (EPRX). Our calculation.
In June 2026, of the 1,199 slots with winning bids, the top 1% by revenue (average winning price × winning volume) accounted for 6.7% of the month's revenue. There were 59 slots with a nationwide average winning price of 10 yen/kW per 30 min or more, and 241 slots with no winning bids.
Slots with the highest maximum winning prices (by area where the power source is located):
| Date | Time | Area | Maximum winning price (yen/kW per 30 min) |
|---|---|---|---|
| June 1 | 9:30 | Tokyo | 97.00 |
| June 1 | 10:00 | Tokyo | 97.00 |
| June 2 | 9:00 | Tokyo | 97.00 |
| June 2 | 11:30 | Tokyo | 97.00 |
| June 4 | 9:00 | Tokyo | 97.00 |
Wholesale electricity is electricity bought and sold among power companies and retailers. Its price is set on the "spot market" of the Japan Electric Power Exchange (JEPX), a market where electricity for the next day is traded the day before. "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When transmission lines between regions are congested, prices split by area, from Hokkaido to Kyushu (area prices).
The monthly average of wholesale electricity for System (nationwide) was 15.10 yen/kWh, against 10.87 yen/kWh in the same month last year (a difference of 4.23 yen).

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our calculation.
Wholesale electricity prices change every 30 minutes. The figure shows the shape of a day, averaging prices at the same time of day across the month. If a battery stores electricity in cheap hours and releases it in expensive hours, the difference becomes the battery's revenue.
The daily low and peak of wholesale electricity were 16.25 yen around 5:30 and 27.93 yen around 18:30 in Tokyo, and 5.75 yen around 12:30 and 15.05 yen around 18:30 in Kyushu.

Source: JEPX spot market. Our calculation.
We took the average price of the day's 4 most expensive hours minus the average price of its 4 cheapest hours, and show the monthly average by area. This equals the difference per kWh when you buy 1 kWh in the 4 cheapest hours and sell it in the 4 most expensive hours. It is a simple difference: electricity lost in charging and discharging and fees are not subtracted, and the order of the cheap and expensive hours is not considered.
The monthly average spread between the 4 most expensive and the 4 cheapest hours was largest in Tohoku at 18.63 yen/kWh and smallest in Kyushu at 8.89 yen/kWh.

Source: JEPX spot market. Our calculation.
| Area | 2-hour spread (yen/kWh) | 4-hour spread (yen/kWh) | Days with a 4-hour spread of 10 yen or more |
|---|---|---|---|
| System (nationwide) | 12.11 | 10.52 | 15 |
| Hokkaido | 18.90 | 16.70 | 25 |
| Tohoku | 20.71 | 18.63 | 25 |
| Tokyo | 15.65 | 12.89 | 23 |
| Chubu | 14.29 | 12.47 | 20 |
| Hokuriku | 12.81 | 10.72 | 14 |
| Kansai | 12.93 | 10.74 | 14 |
| Chugoku | 10.30 | 9.20 | 11 |
| Shikoku | 13.59 | 11.66 | 21 |
| Kyushu | 9.95 | 8.89 | 12 |
The spread is the monthly average of the daily differences. June 2026 covers 30 days.
We show the same 4-hour spread day by day. The larger the spread on a day, the more room a battery has to earn from it.
Of the 30 days, the 4-hour wholesale spread was 10 yen or more on 25 days in Hokkaido and Tohoku, 23 days in Tokyo, 15 days for System (nationwide), 12 days in Kyushu and 11 days in Chugoku.

Source: JEPX spot market. Our calculation.
The capacity market buys electricity supply capacity four years ahead through an annual auction. The price is set in yen per kW per year. The left figure shows the clearing prices of past main auctions. The right figure shows the battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (a separate auction that supports new builds such as batteries and pumped hydro). These figures are published once a year, so they do not change from month to month. The latest is for delivery FY2029 (published January 2026).
In the capacity market, Tokyo's clearing prices for delivery FY2024 to FY2029 were 14,137 yen/kW, 3,495 yen/kW, 5,834 yen/kW, 9,555 yen/kW, 14,812 yen/kW and 15,111 yen/kW. In the Long-Term Decarbonization Power Source Auction, the battery and pumped hydro capacity awarded in the FY2025 round was 819 MW for lithium-ion and 886 MW for non-lithium. Both are the latest annual published figures.

Source: Auction results and capacity securing contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources in the last section (Assumptions and terms)). As published.
We counted the projects newly listed this month on DealRoom (our data room for buyers, where we list battery storage projects), by the grid operator's grid area. These are figures for projects we handled, not counts for the whole market. Transfer of rights is a sale that hands over the land and power rights. Completed-build handover is a sale that hands over the plant once it is built.
In June 2026, DealRoom had 93 new listings totalling 775.0 MW. By grid area: Kyushu 18 projects and 303.0 MW, Chubu 39 projects and 288.0 MW, and Tokyo 15 projects and 126.0 MW.

Source: Our DealRoom records (project locations are given only down to grid area; prices and parties are not listed).
A grid connection study is the procedure in which the grid operator checks "can this site connect, and how much will the work cost?" The grid connection cost contribution is the part of the connection work cost paid by the applicant. Of the response letters we received, we totalled only the high-voltage cases (connecting to 6,600 V distribution lines), by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.
In the high-voltage-only totals (as of October 19, 2026), the median construction period in grid connection studies ranged from 8.0 months in Tokyo to 17.0 months in Tohoku. The median grid connection cost contribution ranged from ¥3.02 million in Tokyo to ¥32.35 million in Tohoku.

Source: Our totals of the high-voltage share of grid connection study response letters received from general transmission and distribution operators (as of October 19, 2026).
We put the figures behind the charts in the main text into tables you can use in your materials: ① nationwide figures by product for the balancing market (bid-to-requirement ratio, award rate, prices, battery share), ② area figures and trading volume for wholesale electricity (JEPX), and ③ capacity market clearing prices.
Balancing market (June 2026, preliminary, nationwide)
| Product | Tendered volume (MW) | Bid volume (MW) | Winning volume (MW) | Bid-to-requirement ratio (bids ÷ tendered) | Award rate (won ÷ bids) | Average winning price (yen/kW per 30 min) | Battery share |
|---|---|---|---|---|---|---|---|
| Primary reserve (online) | 1,388.0 | 1,481.9 | 1,202.1 | 106.8% | 81.1% | 4.00 | 23.5% |
| Primary reserve (offline) | 497.1 | 256.1 | 175.7 | 51.5% | 68.6% | 11.71 | 99.2% |
| Secondary reserve 1 | 886.5 | 2,016.3 | 1,104.8 | 227.4% | 54.8% | 2.55 | 1.9% |
| Secondary reserve 2 | 981.7 | 3,370.4 | 2,077.0 | 343.3% | 61.6% | 2.23 | 0.7% |
| Tertiary reserve 1 | 2,263.2 | 5,484.1 | 2,929.1 | 242.3% | 53.4% | 2.11 | 0.5% |
| Tertiary reserve 2 | 542.6 | 1,386.3 | 522.9 | 255.5% | 37.7% | 2.45 | 0.3% |
| Composite product | 3,190.6 | 6,023.2 | 3,400.0 | 188.8% | 56.4% | 2.67 | 8.4% |
Volumes are averages per 30-minute slot. Products with a bid-to-requirement ratio below 100% did not receive enough bids to cover the tendered volume. The award rate is the share of bid volume that won.
Wholesale electricity, JEPX spot market (June 2026, by area, yen/kWh)
| Area | Monthly average | Same month last year | Daytime (8:00–16:00) | Evening (16:00–20:00) | 4-hour spread | Maximum | Slots at 30 yen or more | Slots at 0.01 yen |
|---|---|---|---|---|---|---|---|---|
| System (nationwide) | 15.10 | 10.87 | 13.06 | 19.46 | 10.52 | 32.17 | 25 | 2 |
| Hokkaido | 14.51 | 9.37 | 8.51 | 21.22 | 16.70 | 40.00 | 24 | 81 |
| Tohoku | 15.29 | 11.05 | 9.05 | 22.51 | 18.63 | 46.00 | 54 | 115 |
| Tokyo | 20.01 | 12.96 | 20.99 | 24.60 | 12.89 | 50.01 | 118 | 0 |
| Chubu | 17.92 | 11.04 | 16.55 | 22.82 | 12.47 | 40.24 | 82 | 4 |
| Hokuriku | 13.94 | 10.68 | 14.12 | 17.36 | 10.72 | 40.14 | 35 | 4 |
| Kansai | 13.88 | 10.68 | 14.06 | 17.31 | 10.74 | 40.14 | 34 | 7 |
| Chugoku | 10.79 | 9.41 | 8.45 | 13.49 | 9.20 | 28.00 | 0 | 69 |
| Shikoku | 7.88 | 9.20 | 6.12 | 9.31 | 11.66 | 20.95 | 0 | 189 |
| Kyushu | 10.02 | 9.37 | 7.58 | 13.17 | 8.89 | 28.00 | 0 | 128 |
Trading volume (June 2026, total of 30 days): total contracted volume 28,588 million kWh (same month last year 22,294 million kWh), sell bids 47,236 million kWh, buy bids 35,469 million kWh.
Capacity market main auction area prices (yen/kW per year)
| Delivery fiscal year | Hokkaido | Tohoku | Tokyo | Chubu | Hokuriku | Kansai | Chugoku | Shikoku | Kyushu |
|---|---|---|---|---|---|---|---|---|---|
| FY2024 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 |
| FY2025 | 5,242 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 5,242 |
| FY2026 | 8,749 | 5,833 | 5,834 | 5,832 | 5,832 | 5,832 | 5,832 | 5,832 | 8,748 |
| FY2027 | 13,287 | 9,044 | 9,555 | 7,823 | 7,638 | 7,638 | 7,638 | 7,638 | 11,457 |
| FY2028 | 14,812 | 14,812 | 14,812 | 10,280 | 8,785 | 8,785 | 8,785 | 8,785 | 13,177 |
| FY2029 | 14,972 | 15,111 | 15,111 | 12,388 | 12,388 | 12,388 | 12,388 | 12,388 | 15,112 |
Battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (10,000 kW)
| Bidding year | Category | Awarded capacity (10,000 kW) |
|---|---|---|
| FY2023 round | Batteries and pumped hydro | 166.9 |
| FY2024 round | 3 to 6 hours | 96.1 |
| FY2024 round | 6 hours or more | 76.9 |
| FY2025 round | Lithium-ion | 81.9 |
| FY2025 round | Non-lithium | 88.6 |
Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →
Register on our data room, DealRoom (free), to request project-level documents such as grid connection answers. The list of projects can be viewed without registering.
Register on DealRoom → See projects for sale