Japan grid-scale battery storage projects for sale: market data

The 280 projects we list, counted by grid area, prefecture, voltage class, structure, status, size and expected grid connection: where the projects are, when they are expected to connect, and how many can be bought as development rights or as completed-build handovers. As of . The tables are also available as CSV (Japanese).

280projects listed for sale
2,197 MWtotal capacity (4,441 MWh)
38prefectures, 9 grid areas
46extra-high voltage (roughly 10 MW and above)
78new in the last 14 days

These are the battery storage projects for sale that have been brought to ScienceX and cleared for listing, all with a grid connection study answer from the utility. They are ScienceX’s own listings, not statistics for the whole Japanese market. Sites and sellers are not published (prices and documents are on Chikudensho Market after free registration). The figures are recounted every morning from the same data as the project list.

Projects and capacity by grid area

Grid area = the service area of the general transmission and distribution operator.

Tokyo65 (23%)
Chubu59 (21%)
Kyushu88 (31%)
Kansai24 (9%)
Chugoku15 (5%)
Tohoku22 (8%)
Hokkaido3 (1%)
Hokuriku3 (1%)
Shikoku1 (0%)
Projects and total capacity by grid area (total MW is the sum for the 239 projects with a MW value)
Grid areaProjectsTotal MW
Tokyo65168
Chubu59436
Kyushu88927
Kansai24199
Chugoku15175
Tohoku22250
Hokkaido334
Hokuriku36
Shikoku12

Projects by prefecture (top 10)

There are projects in 38 prefectures.

Projects by prefecture (top 10)
PrefectureProjects
Kagoshima30
Shizuoka22
Saitama20
Kumamoto18
Gifu17
Tochigi15
Miyazaki13
Saga11
Fukuoka10
Fukushima9

Voltage class, structure and status

High-voltage projects are mostly around 2 MW; extra-high-voltage projects are roughly 10 MW and above. A project is sold either as development rights that the buyer builds out (transfer of rights) or as a completed-build handover. Status shows whether the utility has answered the grid connection study, whether the grid construction cost has been fixed, or whether the project is already connected.

Voltage class

High voltage231 (82%)
Extra-high voltage46 (16%)
Low voltage3 (1%)

Structure

Completed-build handover188 (67%)
Transfer of rights89 (32%)
Under review3 (1%)

Status

Grid connection study answered212 (76%)
Grid cost confirmed63 (22%)
Grid-connected5 (2%)

Voltage class and structure combined

For each voltage class, how many projects are sold as development rights (the buyer builds) and how many as completed-build handovers. Of 231 high-voltage projects, 186 are completed-build handovers; of 46 extra-high-voltage projects, 43 are transfers of rights.

Projects by voltage class and structure (all 280 projects)
Voltage classTransfer of rightsCompleted-build handoverUnder reviewTotal
High voltage431862231
Extra-high voltage432146
Other3003
Total891883280

All 280 projects are counted. Voltage classes with fewer than 5 projects (Low voltage) are combined as “Other”. “Under review” means the structure is not yet fixed.

Projects by size (MW)

The 239 projects with a capacity value, grouped by size (41 of the 280 projects have no value and are not counted). Median size: high voltage 2 MW (195 projects); extra-high voltage 37.5 MW (44 projects).

Under 2 MW35 (15%)
2 to under 10 MW162 (68%)
10 to under 30 MW16 (7%)
30 MW or more26 (11%)

Shares are of the 239 projects with a value. Medians are shown only for voltage classes with at least 5 projects.

Expected grid connection

Projects with a planned operation date are counted by Japanese fiscal half-year (the fiscal year starts in April); the others by the months to connection stated in the grid connection study answer. 111 projects have a planned date, 119 have no planned date but a stated number of months, and 45 are under review. In all, 153 projects (including some with a planned date) have a stated number of months; the “Months to connection” chart counts these 153.

Planned operation (fiscal half-year)

FY2026 H2 (Oct–Mar)13 (12%)
FY2027 H1 (Apr–Sep)36 (32%)
FY2027 H2 (Oct–Mar)21 (19%)
FY2028 H1 (Apr–Sep)20 (18%)
FY2028 H2 (Oct–Mar)6 (5%)
FY2029 H1 (Apr–Sep)5 (5%)
FY2029 H2 (Oct–Mar)6 (5%)
FY2030 H1 (Apr–Sep)1 (1%)
FY2030 H2 (Oct–Mar)1 (1%)
FY2031 H1 (Apr–Sep)1 (1%)
FY2031 H2 (Oct–Mar)1 (1%)

Months to connection in the answer · median 18 months

Within 6 months23 (15%)
7–12 months40 (26%)
13–24 months55 (36%)
25 months or more35 (23%)

Start point of the months

Start point not stated (as written in the answer)136 (89%)
From payment of the grid construction cost17 (11%)

Months to grid connection, by structure

The 153 projects whose grid connection study answer states the months needed to connect, counted by structure (127 of the 280 projects have no figure and are not counted). By voltage class, the median is high voltage 12 months (123 projects); extra-high voltage 31.5 months (30 projects).

Months to grid connection stated in the utility’s answer, by structure (median and counts per band, 153 projects with a figure)
StructureProjects with a figureMedianWithin 6 months7–12 months13–24 months25 months or more
Transfer of rights6124 months5101729
Completed-build handover9112 months1829386

The months are as written in the utility’s answer; 17 of them state a start point (such as payment of the grid construction cost). These are not months from the planned commercial operation date. Structures with fewer than 5 figures (1 project) are not shown.

Listed projects by week

Number and total capacity of the projects visible to buyers at the end of each week (Monday-start weeks, last 12). The latest week is partial, as of 2026-11-23.

Listed projects per week (high voltage and extra-high voltage) 0 138 277 124 9/14 9/28 10/12 10/26 11/9 277 11/23 projects

High voltageExtra-high voltage

Listed projects and total capacity by week (last 12 weeks, by voltage class and structure)
Week ofProjectsTotal MWHigh voltageExtra-highTransfer of rightsCompleted-buildNew listings
1241,3861042033905
1281,3911111733949
1241,2931091530936
1291,28311316359410
1341,33011717369612
1331,3761151838933
153—133174510430
177—150245511326
229—206205216867
243—219216516931
279—230468918753
(partial)280—23146891881

The chart stacks high voltage and extra-high voltage; projects without a voltage (3 in the latest week) are not in the chart but are in the table counts. Total MW is shown as “—” for weeks when many projects had no capacity value, so that gaps in the data are not read as a change in market size. Growth in the number of listings reflects when we added projects to the list (some were added in batches), not growth of the market. ScienceX’s own listings, not statistics for the whole Japanese market. Projects whose structure is under review are not in the last two structure columns. No prices, sites or names are published here.

Listings by month first listed

Projects now listed, by the month they were first listed. Projects taken off the list are not included. Growth in the number of listings reflects when we added projects to the list (some were added in batches), not growth of the market.

Projects by month first listed (up to the latest six months with listings, projects now listed)
Month first listedProjects
36
21
24
62
137

What buyers are asking for now (12 requests)

The conditions in the 12 buyer requests now listed on Chikudensho Market (conditions that buyers post for projects they want to buy), counted by option.

Purchase structure

Transfer of rights8 (67%)
Completed-build handover3 (25%)
Not specified1 (8%)

Voltage

High voltage9 (75%)
Other options1 (8%)
Not specified2 (17%)

Grid areas wanted (several allowed)

Tohoku6 (50%)
Tokyo9 (75%)
Chubu7 (58%)
Kansai7 (58%)
Chugoku3 (25%)
Kyushu3 (25%)
Other options2 (17%)
Not specified3 (25%)

Wanted commercial operation

By Sep 20273 (25%)
By Mar 20286 (50%)
Other options2 (17%)
Not specified1 (8%)

Grid-process stage wanted

Answer to the connection application received (or later)3 (25%)
Grid construction cost paid (or later)3 (25%)
Other options2 (17%)
Not specified4 (33%)

With only 12 requests, no trend over time is shown, and neither the buyers’ company profiles nor the dates posted are published. A request may name several grid areas, so area counts can add up to more than 12; shares are of the 12 requests. Options chosen fewer than 3 times are combined as “Other options”; requests that leave a field blank are “Not specified”. Recounted every morning from the public list on Chikudensho Market (counts last changed: ).

Download the data, and how to cite it

The tables on this page are also available as CSV (UTF-8 with BOM), rebuilt every morning from the same data. No prices, project names or sites are included.

How to cite

You are welcome to quote the figures and charts on this page. Please give the source as follows.

Source: Science X Inc., “Grid-scale battery storage projects for sale in Japan: market data” (updated 2026-11-23), https://www.scix.co.jp/en/market-data

Page: https://www.scix.co.jp/en/market-data · Updated:

The full project list in English is on Projects; market prices (JEPX, capacity market) are on Battery Storage Market Data.

See the projects themselves on Chikudensho Market

Current listings can be browsed on Chikudensho Market without registering. Prices and documents are shown after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).

Browse projects on Chikudensho Market → Contact ScienceX