- From April 2027, the control devices of grid-connected storage sites will need a JC-STAR ★1 label.
- 395 products hold a label. All are at the lowest level, ★1, and 189 of them relate to solar and batteries.
- Japanese companies lead with 137, followed by Taiwan and Korea. None of the 16 big Chinese makers appears yet.
When you buy a storage site, you will now need to check the label on its devices. From April 2027, the control devices of grid-connected storage sites need a JC-STAR ★1 label.
So who holds that label? We counted the list published by the Information-technology Promotion Agency, Japan (IPA), one entry at a time. This article is the entry point for those numbers.
Why a storage site needs a label
A storage site does not run on a box of batteries alone. The PCS changes the form of electricity. The BMS watches the battery. The EMS decides when to charge and discharge. Each is a small computer on a network.
Makers and maintenance firms can change settings and fix software from far away. This is convenient. But if someone hijacks that data path, they can stop the site from outside.
Countries have begun to take up this worry. In May 2025, Reuters reported that US experts had found undocumented communication devices in some Chinese-made inverters. The makers and the number of units were not disclosed. In November 2024, Lithuania banned by law remote control from China and other countries over solar, wind and storage plants above 100 kW.
Japan chose to draw the line with a label. For high-voltage and extra-high-voltage solar and batteries whose contract application is accepted on or after 1 April 2027, control devices connected to the internet need ★1. For low voltage, the date is 1 October 2027.
We wrote in 52-3 Existing plants that the starting point is the acceptance date of the contract application. The whole scheme is set out in COLUMN 14.
Terms used in this series
This series uses the terms below. All four articles share the same table.
| Term | Meaning |
|---|---|
| JC-STAR | A security labelling scheme for devices connected to the internet (IoT devices). METI launched it in March 2025. The Information-technology Promotion Agency, Japan (IPA) runs it. |
| ★1 (Level 1) | The lowest level. The maker checks the basic rules itself and applies. The rules include no default passwords, a contact point for faults, and software that can be fixed. Third-party assessment applies only at ★3 and ★4. |
| PCS (power conditioning system) | The machine that changes the form of electricity between the battery (DC) and the grid (AC). It is the heart of a storage site. |
| BMS | The battery management system. It watches the temperature and voltage of the battery. |
| EMS | The energy management system. It decides when to charge and when to discharge. |
| Remote monitoring / gateway | The front door that connects a power plant or storage site to outside networks. |
| The grid / grid connection | The grid means the transmission and distribution lines of the power companies. Connecting a power plant or storage site to it is called grid connection. |
| Grid operator (general transmission and distribution operator) | The transmission and distribution companies of the large power utilities. There are 10 across Japan, such as Tokyo Electric Power Grid. |
| Connection study | A procedure in which the grid operator checks whether a site can connect and how much the works will cost. It comes before the contract application. |
| Contract application | The formal application filed after the connection study reply. It counts as accepted only when the documents are complete and the deposit has been paid. |
| Extra-high voltage, high voltage, low voltage | The voltage classes of the connection. High voltage is roughly under 2,000 kW and low voltage is under 50 kW. Extra-high voltage is larger than both. |
The numbers
First, four figures for the whole list. All are our counts of IPA's list (Excel version, updated 12 November 2026).
How we chose the 189: we selected battery systems, PCS, BMS, EMS, metering and control units and remote monitoring from the product names and the description on each product page. General-purpose routers and cameras are not included.
★1 is the lowest level. The maker checks that it meets the rules and applies to IPA. No product has yet been assessed by a third party at ★3 or ★4.
So today, "★1 obtained" means this: the maker has checked that the basic locks are in place, and IPA has accepted the application.
Which countries' companies hold labels
Figure 1 splits the 189 solar and battery entries by the country of each company's headquarters. A Japanese subsidiary of a foreign parent is counted under the parent's country.
Japan has 137, or 70% of the total. In the grid-scale group these include Fuji Electric, Nissin Electric, TMEIC, Meidensha, Daihen, GS Yuasa, Sumitomo Electric, NGK Insulators and PowerX. In the residential group they include Nichicon, Choshu Sangyo, Panasonic, Kyocera and Omron.
Only one entry comes from a company headquartered in China. It is a residential metering and control unit from Suntech Power Japan.
The 11 entries marked "HQ not confirmed" include 3 RENON POWER batteries. The company says its headquarters is in the US, but it also has affiliates in China, and we could not confirm the parent's country.
The big Chinese makers are not listed yet
On 1 July 2026, Nikkei reported that the products of Chinese makers, which hold a large share of Japan's PCS and battery market, were not on the list. The 12 November list is the same. The table below shows where the 16 big Chinese-headquartered makers stand now.
| Chinese-headquartered maker | Label under its own name | Reported moves |
|---|---|---|
| Sungrow | None | Did not answer Nikkei's enquiry (July 2026). Its Japanese arm announced in March 2026 a basic agreement with Blue Sky Energy on supplying grid-scale batteries |
| Huawei | None | Did not answer Nikkei's enquiry (July 2026) |
| CATL and BYD | None | Nikkei reported that neither was on the list as of 30 June |
| GoodWe | None | Announced a set-up in which PCS communication is limited to RS485 and has no direct link to outside networks. It will propose this case by case, paired with a ★1 logger and EMS (PR TIMES, 10 August and 24 September 2026) |
| Hithium, Trina Storage, Sineng, Kehua, Solis, Envision, Gotion, REPT, EVE, Narada, Pylontech | None | We found no published policy |
IPA's list shows only labels that have been issued. From outside, we cannot tell whether a company has applied and is waiting, or has not applied.
Why have they not obtained labels? An executive of a Chinese maker told Nikkei: "Only Chinese companies' applications are being rejected. It is a de facto exclusion." METI said it judges "comprehensively, on the basis of the submitted information", and does not disclose individual decisions.
According to Nikkei, the application checklist has an item asking whether the company could be affected by foreign laws. Nikkei also reports an expert view that China's National Intelligence Law collides with this item. But the real reason cannot be confirmed from outside.
GoodWe's plan is shaped to fit the line of the requirement. ANRE's FAQ excludes devices without IP communication. But a device with IP communication needs ★1 even if that function is left unused. Whether the plan will be accepted has to be checked with the grid operator, project by project.
Taiwanese companies have moved in
Taiwanese companies have moved into the vacant seats. Seven companies obtained 14 labels. NextDrive, founded in Taiwan, holds 3 more.
| Taiwan HQ | Number | Products (date obtained) | Company announcement |
|---|---|---|---|
| TAITEN (Hong De Energy) | 4 | Site controller and PCS (25 June 2026), EMS (7 Sept), BMS (9 Sept) | Announced on 13 October that it obtained certification for 5 products (4 match the company name on the list) |
| Delta Electronics | 4 | Data collector (25 June), PCS and storage system for storage sites (2 July), battery (21 Aug; in the name of the Taiwan headquarters) | — |
| SEETEL | 2 | EMS (12 April), BMS (21 April) | Announced in May 2026 that it is the first Taiwanese storage system company to obtain both EMS and BMS |
| GBG | 1 | BMS (5 Oct) | — |
| Cold Electric (Chang Gung International Energy) | 1 | Storage system (4 Aug) | Its Japanese partner is Yuasa M&B |
| Ming Yao Technology | 1 | 20-foot storage container (4 Aug) | In June it signed a memorandum with a Japanese developer (name not disclosed) for 4 MW / 16 MWh |
| Shin Jie Neng (MTE) | 1 | EMS (4 Aug) | Announced in September 2026 that it obtained the label a little over a month after applying |
Taipowerway (a subsidiary of J&V Energy) announced on 11 September 2026 that it obtained a label for EMS, but the company's name is not on the 12 November version. It may be listed under another name.
The wording of Japan's requirement has no nationality condition. So the seats left open by the Chinese makers can be taken by Taiwanese companies.
Labels were obtained in three waves
Figure 2 shows the number of labels obtained each month. There are three peaks.
- October 2025 (24). Domestic grid-scale companies such as Fuji Electric, Nissin Electric, Daihen and Shirokuma Denryoku moved first. This was before the 20th Grid Code Review Committee (16 December 2025), which set out the direction of the requirement.
- March to April 2026 (48). Mostly residential: 30 of the 48.
- From June 2026. Grid-scale products from Taiwan and Korea came in.
By type of device
Figure 3 is a table that crosses the type of device with the country of the headquarters.
There are 14 PCS, the machines that change the form of electricity, for storage and grid use. Japan has 7, Taiwan 2, Korea 2, Europe 1 and HQ not confirmed 2. China has 0. For now, the PCS a buyer can choose in a project come from 12 companies and 14 products.
The first expiries come in May 2027
A ★1 label is valid for up to 2 years from the day it was obtained. The 10 labels obtained in May 2025 expire between 6 and 27 May 2027. That is the month after the requirement starts.
IPA said it would announce the details of the extension procedure "in 2026". As of 15 November, it has not done so. We list which products expire and when in 52-2 The list.
What a buyer checks is the registration number
The wording of Japan's requirement has no nationality condition. Even so, the big Chinese names do not appear on the list. The reason cannot be known from outside.
A buyer can check two things. Does the model number of the project's device match a product on IPA's list? And is that registration number valid now? The table for checking is in the next article, 52-2 The list.
How to read this series
Frequently asked questions
How many JC-STAR certified products are there now?
IPA's list of products with the conformity label has 395 entries, as updated on 12 November 2026. All are ★1, and none is ★2 or above. By our count, 189 of them relate to solar and batteries (battery systems, PCS, BMS, EMS, metering and control units, and remote monitoring).
Do Chinese PCS and battery makers hold JC-STAR labels?
On the 12 November list, the 16 big Chinese makers, including Sungrow, Huawei, CATL, BYD and GoodWe, hold none under their own names. The only Chinese-headquartered company on the list is Suntech Power Japan, with one residential metering and control unit. The Chinese makers say their applications have been rejected, and METI does not disclose individual decisions (Nikkei, 1 July 2026).
Why does a storage site need JC-STAR?
The PCS, BMS, EMS and remote monitoring units are small computers on a network. If someone hijacks the data path, they can stop the site from outside. So for high-voltage and extra-high-voltage solar and battery projects whose contract application is accepted on or after 1 April 2027, devices with IP communication need ★1. For low voltage, the date is 1 October 2027.
Primary sources and related articles
The JC-STAR list and procedures
- IPA, "List of products with the conformity label" (updated 12 November 2026, Excel version)JA. The information page of each product (maker and mutual recognition fields) can be reached from here
- IPA, "Application procedure"JA (validity up to 2 years; fee ¥198,000)|IPA, "Procedure for extending ★1 and ★2"JA ("details to be announced in 2026")
Grid connection requirements
- e-Gov public comment, draft revision of the Guideline on Technical Requirements for Grid Interconnection (case no. 620340012, 6 October to 6 November 2026)JA
- ANRE, "Cybersecurity measures for distributed power sources" (July 2026, PDF)JA|ANRE, "Frequently asked questions" (PDF)JA
- OCCTO, 20th Grid Code Review Committee, Material 5 (16 December 2025, PDF)JA
News reports and company announcements
- Nikkei, "Chinese batteries still have zero Japanese cyber certifications; 'de facto exclusion', they protest" (1 July 2026)JA|Nikkei Asia (same day, in English)
- Reuters (14 May 2025), "Rogue communication devices found in Chinese solar power inverters" (summarised by PV Tech)
- GoodWe Japan (PR TIMES, 10 August 2026)JA|same, 24 SeptemberJA|Sungrow Japan and Blue Sky Energy, basic agreement (announced 24 March 2026)JA|RENON POWER (PR TIMES, 15 July 2026)JA
- Announcements by Taiwanese companies: SEETEL (Economic Daily News, 5 May 2026)ZH|Shin Jie Neng (Commercial Times, 1 September 2026)ZH|TAITEN (Hong De Energy) (China Times, 13 October 2026)ZH|Cold Electric (Chang Gung International Energy) (Economic Daily News)ZH|Taipowerway (TechNews, 11 September 2026)ZH
Related articles
- What JC-STAR is, and when ★1 becomes mandatory for grid batteries in Japan (COLUMN 14) / Equipment changes after the connection study reply / The technical checks before you buy a grid-scale storage site / The hurdles foreign capital must clear before investing in Japanese high-voltage grid-scale storage