In three lines
  1. The EU, Lithuania and the US have begun to exclude inverters by nationality or place of production. Japan and Australia draw the line with labels and standards that do not ask about nationality.
  2. Japan has mutual recognition of labels with the UK and Singapore, but what you need to connect to the grid is a JC-STAR label issued by IPA. No product on today's list was obtained through mutual recognition.
  3. Japan's text has no nationality condition. But it is reported that the application checklist has an item asking about the influence of foreign laws.

When people talk about JC-STAR, someone sometimes says: "So it is a scheme to shut out Chinese products." The text does not say so. Europe and the US have begun to exclude inverters by nationality or place of production, but what Japan has put in place is a "label".

This article sets out the world's lines on one chart. Then it answers, from the text and the list, the question: "Could a company get in through Singapore?"

In this article
The world's lines on one chart Terms used in this series Countries that draw the line by nationality Countries that draw the line by label Comparison by country Mutual recognition is not a loophole Does nationality enter the label review? When ★2 arrives In closing How to read this series FAQ

The world's lines on one chart

Figure 1 splits the cyber rules for solar and battery control devices into two groups. The upper group draws the line by labels and standards. The lower group draws it by nationality or place of production.

Fig. 1 Countries that use a label, and countries that screen by nationality Cybersecurity rules for solar and storage control equipment, as of 15 Nov 2026. Dates and legal references are in Table 2 By label or standard (no nationality condition in the text) Japan JC-STAR ★1 Japan is here From April 2027, grid-connected solar and storage control equipment must carry the ★1 label, issued by IPA. Australia Inverter standard and approved list Only inverters that meet the national standard and communications specification may be used. No nationality condition. EU Product law (CE marking) Security requirements for radio equipment and digital products. Nationality is not a criterion. By nationality or place of production EU Projects funded with EU money A policy of keeping out inverters from “high-risk” suppliers such as China. Known from press reports; no formal published document. Lithuania Remote control banned by law Bars remote control of plants over 100 kW by companies from China and other threat countries, including existing plants. United States Equipment authorisation, defence procurement New authorisations for foreign-produced inverters with communications are stopped; defence procurement excludes products from China and others. Taiwan Ban on Chinese solar cells Imports of Chinese solar cells and modules are banned. No law found that targets inverters alone. Japan's requirement contains no nationality condition. The application checklist, however, reportedly asks whether foreign laws could affect the product (Nikkei, July 2026).

Terms used in this series

This series uses the terms below. All four articles share the same table.

Table 0 | Terms used in this series (quick reference)
TermMeaning
JC-STARA security labelling scheme for devices connected to the internet (IoT devices). METI launched it in March 2025. The Information-technology Promotion Agency, Japan (IPA) runs it.
★1 (Level 1)The lowest level. The maker checks the basic rules itself and applies. The rules include no default passwords, a contact point for faults, and software that can be fixed. Third-party assessment applies only at ★3 and ★4.
PCS (power conditioning system)The machine that changes the form of electricity between the battery (DC) and the grid (AC). It is the heart of a storage site.
BMSThe battery management system. It watches the temperature and voltage of the battery.
EMSThe energy management system. It decides when to charge and when to discharge.
Remote monitoring / gatewayThe front door that connects a power plant or storage site to outside networks.
The grid / grid connectionThe grid means the transmission and distribution lines of the power companies. Connecting a power plant or storage site to it is called grid connection.
Grid operator (general transmission and distribution operator)The transmission and distribution companies of the large power utilities. There are 10 across Japan, such as Tokyo Electric Power Grid.
Connection studyA procedure in which the grid operator checks whether a site can connect and how much the works will cost. It comes before the contract application.
Contract applicationThe formal application filed after the connection study reply. It counts as accepted only when the documents are complete and the deposit has been paid.
Extra-high voltage, high voltage, low voltageThe voltage classes of the connection. High voltage is roughly under 2,000 kW and low voltage is under 50 kW. Extra-high voltage is larger than both.

Countries that draw the line by nationality

Three draw the line mainly by nationality or place of production.

Taiwan also bans imports of Chinese solar cells and modules. Dates and law numbers are in Table 2.

Countries that draw the line by label

Japan and Australia set no nationality condition. From April 2027, Japan asks for JC-STAR ★1 on control devices of solar and battery systems connected to the grid. Australia lets only inverters that meet its national standard and communication specification be used. The EU's product rules (the CE mark) also do not ask about nationality.

As of November 2026, Germany, the Netherlands and Korea have not started regulation that makes nationality a condition for inverters. In Germany and Korea, consideration has been reported.

Comparison by country

Table 2 lines up each country's rules by when they start, what they cover and how they draw the line. The right-hand column shows what we used to check each.

Table 2 | Cyber rules for solar and battery control devices (as of 15 November 2026)
Country / regionRuleFrom whenWhat it coversHow the line is drawnExisting equipmentSource checked
JapanRevision of the Guideline on Technical Requirements for Grid Interconnection (JC-STAR ★1)Extra-high and high voltage 1 April 2027, low voltage 1 October (starts from the acceptance date of the contract application)Control devices of solar and battery systems that have IP communicationLabelNot retroactive (applies to devices added or replaced)Primary source
AustraliaAS/NZS 4777.2 Amd 2, CSIP-AUS v1.2Amd 2 from 23 August 2025. CSIP-AUS becomes mandatory in Victoria on 1 November 2026Inverters connected to the gridTechnical standardNoPrimary source
EU (products)RED delegated regulation, Cyber Resilience Act (CRA)RED 1 August 2025; main CRA obligations December 2027Radio equipment and digital productsStandard (CE)NoPrimary source
EU (funding)A policy to exclude inverters of high-risk suppliers from projects that receive EU moneyReported since late April 2026. Projects under way to notify by 1 MayInverters and PCS for solar, wind and storageNationalityTreatment not announcedPress reports (no published document)
EU (tenders)Net-Zero Industry Act (NZIA) tender criteria30 December 2025At least 30% of the annual volume of renewable tenders, or 6 GW a yearCriteria plus dependence on a countryNoPrimary source
LithuaniaLaw on Electricity, Article 73³ (amending law XIV-3092, 12 November 2024)New plants 1 May 2025. Existing plants to comply by 1 May 2026 (declaration to the system operator by 31 May)Power plants and storage above 100 kWNationalityYesPrimary source and press reports
US (FCC)Addition to the Covered List (DA 26-786, amended by DA 26-870)28 July 2026Grid-connected inverters with communication functions made abroadCountry of productionNo (certified or already purchased units excluded)Primary source
US (defence)National Defense Authorization Act FY2026, section 842 (batteries) and section 847 (PV modules and inverters)From the FY2026 budget (section 842 phased in from January 2028)Products procured by the Department of DefenseNationalityNoPrimary source
US (executive order)Executive order on bulk power system equipment26 August 2026. The Secretary of Energy has not yet made a determinationTransactions in grid equipmentNationalityDepends on the determinationPrimary source
US (Texas)Lone Star Infrastructure Protection Act (2021), SB 2368 (signed 20 June 2025)2021. Strengthened on 1 September 2025Critical grid equipment in the ERCOT areaNationalityAsks for measures also for past purchasesPrimary source
GermanyNo law. The government is considering regulation (answer of 23 June 2026)Not in forcePV inverters connected to the gridUnder consideration—Primary source and press reports
NetherlandsCybersecurity Act (national law implementing NIS2)15 August 2026Energy operators and large generatorsStandard—Primary source
KoreaNo law. The direction is to check communication devices inside inverters in KS certification reviewNot in forceSolar inverters (a report says about 60% of KS-certified products are Chinese-made)Under consideration—Press report
TaiwanA ban on imports of Chinese solar cells and modules. We found no law for inverters alone—Solar cells and modulesNationality—Primary source and press reports

'Press reports' means that no primary source has been published, or that we could not read the primary source. For the EU funding policy, there is no formal published document.

Mutual recognition is not a loophole

People sometimes ask: "Japan has mutual recognition with Singapore, so can Chinese makers get in that way?" Table 3 lists the mutual recognition arrangements now in operation.

Table 3 | JC-STAR mutual recognition
PartnerStatusStart of operationOverseas → JC-STAR procedure
UK PSTI ActIn operation (memorandum November 2025)1 January 2026A product that conforms to PSTI is exempt from checks of three requirements. The fee is ¥140,000 for ★1 (normally ¥198,000)
Singapore CLSIn operation (memorandum 18 March 2026)1 June 2026A product that conforms to CLS is exempt from checks of the requirements treated as equivalent. The fee is ¥140,000 for ★1
US Cyber Trust MarkNo agreement announced——
EU Cyber Resilience ActNot mutual recognition. On 26 October 2026, private bodies signed a memorandum on comparing the schemes——

Whichever route is taken, the JC-STAR label is issued by IPA, not by an overseas authority. There are three reasons why it is not a loophole.

1. The requirement is "a label under IPA's scheme"

Devices shall be used that carry a conformity label of ★1 (Level 1) or higher (hereafter "JC-STAR ★1") under the security requirement conformity assessment and labelling scheme of the Information-technology Promotion Agency, Japan (IPA).Guideline on Technical Requirements for Grid Interconnection, draft revision, Chapter 2, Section 1, 5 (1) (October 2026) (our translation)

A CLS label is not itself a label of IPA's scheme. A product that conforms to CLS must still apply to IPA and receive a JC-STAR ★1 label before it meets the requirement. Mutual recognition lightens only the exemption of some checks, and the fee.

2. CLS is a scheme for household devices

Singapore's CLS is a scheme for consumer IoT devices. PCS and storage systems were never within its scope. In the CLS product list, Huawei's entries were only optical line terminals and Wi-Fi devices.

3. No product was obtained through mutual recognition

Each IPA product page has fields called "Mutual recognition with PSTI" and "Mutual recognition with CLS". We checked all 395 entries on the 12 November version. Every one reads "no application" in both fields. No product has yet obtained ★1 through mutual recognition.

Does nationality enter the label review?

Japan's requirement text has no nationality condition. Even so, the big Chinese names do not appear on the list.

According to Nikkei, an executive of a Chinese maker said: "Only Chinese companies' applications are being rejected. It is a de facto exclusion." Nikkei also reports that the application checklist has an item asking whether the company could be affected by foreign laws. METI does not disclose individual decisions.

The text does not ask about nationality. But what the review looks at cannot be confirmed from outside. The accurate statement is that we cannot say Japan pays no attention to nationality at all.

When ★2 arrives

Work has begun on a ★2-and-above standard suited to power equipment. At the Power Sub-Working Group of the Industrial Cybersecurity Study Group on 19 October 2026, it was reported that the policy is to prepare the study in consultation with IPA.

The national subsidy (Grid-Scale Storage System Deployment Support Programme) has already moved ahead. A device not covered by ★1 must obtain ★2 before supply starts, if a ★2 standard is later set and covers it.

Mutual recognition covers ★1 only. Neither CLS nor PSTI has anything that matches the ★2 requirements specific to power equipment. We expect that if the grid connection requirement rises to ★2, the part that mutual recognition lightens will become smaller still.

In closing

Japan and Australia set the conditions for grid connection by labels and standards that do not ask about nationality. If a seller pitches "we have CLS, so we are fine", the answer rests on the text above. What to look at is the registration number on IPA's list. That table is in 52-2 The list.

We should also say what we have not been able to confirm. These are the revised texts of the 10 grid operators and the result of the public comment on the draft revision. When the draft ★2 standard comes out, we will read the scope of mutual recognition again.

How to read this series

COLUMN 52
Overview
All 395 products are ★1. China's 16 largest makers: zero. Start with the numbers
COLUMN 52-2
The list
Grid-scale, residential and other, in one list. Ten labels expire in May 2027
COLUMN 52-3
Existing plants
The trigger is the date the contract application is accepted. Only the added side, and replacements
COLUMN 52-4
Nationality
Nationality in the West, a label in Japan
You are reading this one

Frequently asked questions

If a product has a Singapore CLS or UK PSTI label, does it meet Japan's grid connection requirement?

No. The draft revision of the Guideline on Technical Requirements for Grid Interconnection asks for devices that carry a ★1 or higher conformity label under IPA's labelling scheme. A CLS or PSTI label is not itself a label of IPA's scheme. A product that conforms to CLS or PSTI must still apply to IPA and receive a JC-STAR ★1 label. Mutual recognition lightens only the exemption of some checks and the fee (¥140,000 for ★1).

Can a Chinese maker get JC-STAR by going through Singapore's CLS?

In principle it can apply, but there is no example. CLS is a scheme for consumer IoT devices, and PCS and storage systems were never within its scope. Each IPA product page has a mutual recognition field, and all 395 entries on the 12 November 2026 version read "no application".

Does Japan also exclude Chinese products by name, as the EU and the US do?

Not in the text. The grid connection requirement is a label requirement that does not ask about nationality, so Japan sits on the same side as Australia. But Nikkei reports that the application checklist has an item asking about the influence of foreign laws, and that Chinese makers protest it is a "de facto exclusion". METI does not disclose individual decisions.

Primary sources and related articles

Japan's requirement and mutual recognition

United States

Europe and elsewhere

Related articles

Supervised by
Shinya Nakashima, Ph.D. (Eng.) — Representative Director, Science X Inc.

Written and supervised on the basis of our work buying grid-scale battery storage projects and selling them on. The JC-STAR counts are our own count of IPA's published list (Excel edition). The reading of the rules rests on published material from ANRE, OCCTO and IPA; where we rely on press reports, the text or table says so. This English edition is a translation of the Japanese original; for legal and regulatory matters, the Japanese primary sources govern. To point out an error, write to s@scix.co.jp.