- The EU, Lithuania and the US have begun to exclude inverters by nationality or place of production. Japan and Australia draw the line with labels and standards that do not ask about nationality.
- Japan has mutual recognition of labels with the UK and Singapore, but what you need to connect to the grid is a JC-STAR label issued by IPA. No product on today's list was obtained through mutual recognition.
- Japan's text has no nationality condition. But it is reported that the application checklist has an item asking about the influence of foreign laws.
When people talk about JC-STAR, someone sometimes says: "So it is a scheme to shut out Chinese products." The text does not say so. Europe and the US have begun to exclude inverters by nationality or place of production, but what Japan has put in place is a "label".
This article sets out the world's lines on one chart. Then it answers, from the text and the list, the question: "Could a company get in through Singapore?"
The world's lines on one chart
Figure 1 splits the cyber rules for solar and battery control devices into two groups. The upper group draws the line by labels and standards. The lower group draws it by nationality or place of production.
Terms used in this series
This series uses the terms below. All four articles share the same table.
| Term | Meaning |
|---|---|
| JC-STAR | A security labelling scheme for devices connected to the internet (IoT devices). METI launched it in March 2025. The Information-technology Promotion Agency, Japan (IPA) runs it. |
| ★1 (Level 1) | The lowest level. The maker checks the basic rules itself and applies. The rules include no default passwords, a contact point for faults, and software that can be fixed. Third-party assessment applies only at ★3 and ★4. |
| PCS (power conditioning system) | The machine that changes the form of electricity between the battery (DC) and the grid (AC). It is the heart of a storage site. |
| BMS | The battery management system. It watches the temperature and voltage of the battery. |
| EMS | The energy management system. It decides when to charge and when to discharge. |
| Remote monitoring / gateway | The front door that connects a power plant or storage site to outside networks. |
| The grid / grid connection | The grid means the transmission and distribution lines of the power companies. Connecting a power plant or storage site to it is called grid connection. |
| Grid operator (general transmission and distribution operator) | The transmission and distribution companies of the large power utilities. There are 10 across Japan, such as Tokyo Electric Power Grid. |
| Connection study | A procedure in which the grid operator checks whether a site can connect and how much the works will cost. It comes before the contract application. |
| Contract application | The formal application filed after the connection study reply. It counts as accepted only when the documents are complete and the deposit has been paid. |
| Extra-high voltage, high voltage, low voltage | The voltage classes of the connection. High voltage is roughly under 2,000 kW and low voltage is under 50 kW. Extra-high voltage is larger than both. |
Countries that draw the line by nationality
Three draw the line mainly by nationality or place of production.
- The EU: The policy is to stop projects that receive EU money from using inverters of "high-risk" companies, such as those in China. It has been reported since late April 2026, but there is no formal published document.
- Lithuania: It has banned by law remote operation from China and other countries over solar, wind and storage above 100 kW. The law also applies to existing plants.
- The US: It has stopped new certification of grid-connected inverters made abroad that have communication functions. In defence procurement, it excludes products from China and other countries. Texas also bans by state law companies tied to hostile countries from touching critical grid equipment.
Taiwan also bans imports of Chinese solar cells and modules. Dates and law numbers are in Table 2.
Countries that draw the line by label
Japan and Australia set no nationality condition. From April 2027, Japan asks for JC-STAR ★1 on control devices of solar and battery systems connected to the grid. Australia lets only inverters that meet its national standard and communication specification be used. The EU's product rules (the CE mark) also do not ask about nationality.
As of November 2026, Germany, the Netherlands and Korea have not started regulation that makes nationality a condition for inverters. In Germany and Korea, consideration has been reported.
Comparison by country
Table 2 lines up each country's rules by when they start, what they cover and how they draw the line. The right-hand column shows what we used to check each.
| Country / region | Rule | From when | What it covers | How the line is drawn | Existing equipment | Source checked |
|---|---|---|---|---|---|---|
| Japan | Revision of the Guideline on Technical Requirements for Grid Interconnection (JC-STAR ★1) | Extra-high and high voltage 1 April 2027, low voltage 1 October (starts from the acceptance date of the contract application) | Control devices of solar and battery systems that have IP communication | Label | Not retroactive (applies to devices added or replaced) | Primary source |
| Australia | AS/NZS 4777.2 Amd 2, CSIP-AUS v1.2 | Amd 2 from 23 August 2025. CSIP-AUS becomes mandatory in Victoria on 1 November 2026 | Inverters connected to the grid | Technical standard | No | Primary source |
| EU (products) | RED delegated regulation, Cyber Resilience Act (CRA) | RED 1 August 2025; main CRA obligations December 2027 | Radio equipment and digital products | Standard (CE) | No | Primary source |
| EU (funding) | A policy to exclude inverters of high-risk suppliers from projects that receive EU money | Reported since late April 2026. Projects under way to notify by 1 May | Inverters and PCS for solar, wind and storage | Nationality | Treatment not announced | Press reports (no published document) |
| EU (tenders) | Net-Zero Industry Act (NZIA) tender criteria | 30 December 2025 | At least 30% of the annual volume of renewable tenders, or 6 GW a year | Criteria plus dependence on a country | No | Primary source |
| Lithuania | Law on Electricity, Article 73³ (amending law XIV-3092, 12 November 2024) | New plants 1 May 2025. Existing plants to comply by 1 May 2026 (declaration to the system operator by 31 May) | Power plants and storage above 100 kW | Nationality | Yes | Primary source and press reports |
| US (FCC) | Addition to the Covered List (DA 26-786, amended by DA 26-870) | 28 July 2026 | Grid-connected inverters with communication functions made abroad | Country of production | No (certified or already purchased units excluded) | Primary source |
| US (defence) | National Defense Authorization Act FY2026, section 842 (batteries) and section 847 (PV modules and inverters) | From the FY2026 budget (section 842 phased in from January 2028) | Products procured by the Department of Defense | Nationality | No | Primary source |
| US (executive order) | Executive order on bulk power system equipment | 26 August 2026. The Secretary of Energy has not yet made a determination | Transactions in grid equipment | Nationality | Depends on the determination | Primary source |
| US (Texas) | Lone Star Infrastructure Protection Act (2021), SB 2368 (signed 20 June 2025) | 2021. Strengthened on 1 September 2025 | Critical grid equipment in the ERCOT area | Nationality | Asks for measures also for past purchases | Primary source |
| Germany | No law. The government is considering regulation (answer of 23 June 2026) | Not in force | PV inverters connected to the grid | Under consideration | — | Primary source and press reports |
| Netherlands | Cybersecurity Act (national law implementing NIS2) | 15 August 2026 | Energy operators and large generators | Standard | — | Primary source |
| Korea | No law. The direction is to check communication devices inside inverters in KS certification review | Not in force | Solar inverters (a report says about 60% of KS-certified products are Chinese-made) | Under consideration | — | Press report |
| Taiwan | A ban on imports of Chinese solar cells and modules. We found no law for inverters alone | — | Solar cells and modules | Nationality | — | Primary source and press reports |
'Press reports' means that no primary source has been published, or that we could not read the primary source. For the EU funding policy, there is no formal published document.
Mutual recognition is not a loophole
People sometimes ask: "Japan has mutual recognition with Singapore, so can Chinese makers get in that way?" Table 3 lists the mutual recognition arrangements now in operation.
| Partner | Status | Start of operation | Overseas → JC-STAR procedure |
|---|---|---|---|
| UK PSTI Act | In operation (memorandum November 2025) | 1 January 2026 | A product that conforms to PSTI is exempt from checks of three requirements. The fee is ¥140,000 for ★1 (normally ¥198,000) |
| Singapore CLS | In operation (memorandum 18 March 2026) | 1 June 2026 | A product that conforms to CLS is exempt from checks of the requirements treated as equivalent. The fee is ¥140,000 for ★1 |
| US Cyber Trust Mark | No agreement announced | — | — |
| EU Cyber Resilience Act | Not mutual recognition. On 26 October 2026, private bodies signed a memorandum on comparing the schemes | — | — |
Whichever route is taken, the JC-STAR label is issued by IPA, not by an overseas authority. There are three reasons why it is not a loophole.
1. The requirement is "a label under IPA's scheme"
Devices shall be used that carry a conformity label of ★1 (Level 1) or higher (hereafter "JC-STAR ★1") under the security requirement conformity assessment and labelling scheme of the Information-technology Promotion Agency, Japan (IPA).Guideline on Technical Requirements for Grid Interconnection, draft revision, Chapter 2, Section 1, 5 (1) (October 2026) (our translation)
A CLS label is not itself a label of IPA's scheme. A product that conforms to CLS must still apply to IPA and receive a JC-STAR ★1 label before it meets the requirement. Mutual recognition lightens only the exemption of some checks, and the fee.
2. CLS is a scheme for household devices
Singapore's CLS is a scheme for consumer IoT devices. PCS and storage systems were never within its scope. In the CLS product list, Huawei's entries were only optical line terminals and Wi-Fi devices.
3. No product was obtained through mutual recognition
Each IPA product page has fields called "Mutual recognition with PSTI" and "Mutual recognition with CLS". We checked all 395 entries on the 12 November version. Every one reads "no application" in both fields. No product has yet obtained ★1 through mutual recognition.
Does nationality enter the label review?
Japan's requirement text has no nationality condition. Even so, the big Chinese names do not appear on the list.
According to Nikkei, an executive of a Chinese maker said: "Only Chinese companies' applications are being rejected. It is a de facto exclusion." Nikkei also reports that the application checklist has an item asking whether the company could be affected by foreign laws. METI does not disclose individual decisions.
The text does not ask about nationality. But what the review looks at cannot be confirmed from outside. The accurate statement is that we cannot say Japan pays no attention to nationality at all.
When ★2 arrives
Work has begun on a ★2-and-above standard suited to power equipment. At the Power Sub-Working Group of the Industrial Cybersecurity Study Group on 19 October 2026, it was reported that the policy is to prepare the study in consultation with IPA.
The national subsidy (Grid-Scale Storage System Deployment Support Programme) has already moved ahead. A device not covered by ★1 must obtain ★2 before supply starts, if a ★2 standard is later set and covers it.
Mutual recognition covers ★1 only. Neither CLS nor PSTI has anything that matches the ★2 requirements specific to power equipment. We expect that if the grid connection requirement rises to ★2, the part that mutual recognition lightens will become smaller still.
In closing
Japan and Australia set the conditions for grid connection by labels and standards that do not ask about nationality. If a seller pitches "we have CLS, so we are fine", the answer rests on the text above. What to look at is the registration number on IPA's list. That table is in 52-2 The list.
We should also say what we have not been able to confirm. These are the revised texts of the 10 grid operators and the result of the public comment on the draft revision. When the draft ★2 standard comes out, we will read the scope of mutual recognition again.
How to read this series
Frequently asked questions
If a product has a Singapore CLS or UK PSTI label, does it meet Japan's grid connection requirement?
No. The draft revision of the Guideline on Technical Requirements for Grid Interconnection asks for devices that carry a ★1 or higher conformity label under IPA's labelling scheme. A CLS or PSTI label is not itself a label of IPA's scheme. A product that conforms to CLS or PSTI must still apply to IPA and receive a JC-STAR ★1 label. Mutual recognition lightens only the exemption of some checks and the fee (¥140,000 for ★1).
Can a Chinese maker get JC-STAR by going through Singapore's CLS?
In principle it can apply, but there is no example. CLS is a scheme for consumer IoT devices, and PCS and storage systems were never within its scope. Each IPA product page has a mutual recognition field, and all 395 entries on the 12 November 2026 version read "no application".
Does Japan also exclude Chinese products by name, as the EU and the US do?
Not in the text. The grid connection requirement is a label requirement that does not ask about nationality, so Japan sits on the same side as Australia. But Nikkei reports that the application checklist has an item asking about the influence of foreign laws, and that Chinese makers protest it is a "de facto exclusion". METI does not disclose individual decisions.
Primary sources and related articles
Japan's requirement and mutual recognition
- e-Gov public comment, draft revision of the Guideline on Technical Requirements for Grid Interconnection (case no. 620340012, October 2026)JA, Chapter 2, Section 1, 5 (1)
- IPA, mutual recognition with the UK PSTI lawJA|IPA, application for mutual recognition of Singapore CLS conformityJA|METI, memorandum with the UK (announced 6 November 2025)|METI, memorandum with Singapore (18 March 2026)JA|CSA Singapore (18 March 2026)|IPA, comparison with the EU CRA scheme (4 November 2026)JA
- IPA, "List of products with the conformity label" (updated 12 November 2026)JA and each product's information page (the "Mutual recognition with PSTI" and "Mutual recognition with CLS" fields)
- SOLAR JOURNAL (Power Sub-Working Group, October 2026)JA|SII, Grid-Scale Storage System Deployment Support Programme, call for applications (September 2026, PDF)JA, note 13
- Nikkei (1 July 2026)JA|Nikkei Asia (same day, in English)
United States
- FCC DA 26-786 (28 July 2026, PDF)|DA 26-870 (20 August 2026, PDF)
- Public Law 119-60 (National Defense Authorization Act FY2026), sections 842 and 847 (PDF)|US Department of Energy, executive order (26 August 2026)|Texas Legislature, history of SB 2368 (signed 20 June 2025, effective 1 September)
Europe and elsewhere
- pv magazine (EU funding, 23 April 2026)|Euronews (4 May 2026)|European Commission, Net-Zero Industry Act|pv magazine (proposed revision of the Cybersecurity Act, 20 January 2026)
- LRT (Lithuania, 12 November 2024)|Lithuanian official register (amending law XIV-3092)
- pv magazine (Germany, 29 June 2026)|Dutch government (15 August 2026)|Clean Energy Council (Australia, CSIP-AUS)|Korean press report (KS certification)