- A grid-scale battery in Japan earns from three markets — the balancing market (EPRX), wholesale power (JEPX) and the capacity market (OCCTO) — on merchant revenue, not a feed-in tariff.
- Grid access is the bottleneck. As of the end of June 2026, 1.28 GW of grid-scale batteries were connected, against about 211 GW of connection studies and about 41 GW of contract applications received (ANRE).
- On Chikudensho Market, projects that already hold a connection study response are sold as a completed-build handover or as a transfer of rights; the ones we list can be viewed without registration.
1. The market in 30 seconds
- Three revenue sources. The balancing market (EPRX) buys the capacity to correct surpluses and shortfalls; wholesale power (JEPX) pays the spread between cheap and expensive hours; the capacity market (OCCTO) pays for being available in a future year. Our monthly Market Notes are laid out in this order.
- Grid access decides the project. The transmission and distribution company's connection study response sets the connection point, construction period and cost contribution. Connected capacity is small against the queue: 1.28 GW connected, about 211 GW of connection studies and about 41 GW of contract applications at the end of June 2026.
- What is for sale. The projects that change hands are mostly ones with a connection study response, sold either as development rights the buyer builds out or as a completed-build handover.
- How many projects are for sale right now. The number we list is recounted every morning, by grid area, prefecture, voltage and expected connection, on Market data. It is our own listing, not a statistic for the whole Japanese market.
The basics in one place: Japan Grid-Scale Storage — A Primer for Overseas Investors · Japan Grid-Scale Battery Glossary: 67 Terms
2. Markets and rules — where the revenue comes from
Balancing market (EPRX)
The general transmission and distribution companies buy balancing capacity (ΔkW) here, in 30-minute slots. The fast products — Primary Reserve and Secondary Reserve 1 — suit batteries best. From transactions on March 13, 2026, trading moved to day-ahead. The price cap for Primary, Secondary 1 and the composite product is ¥10.00 per ΔkW per 30 minutes for deliveries from September 1, 2026, down from ¥15.00 (and ¥19.51 before March 14, 2026).
The full guide: EPRX and Japan's Balancing Market: A Guide · Columns: Japan's Balancing Market — Product List (5 Products) & Composite Bidding · Balancing Market Price Cap Falls to ¥10 — What Disappears
Wholesale power (JEPX)
JEPX trades 48 half-hour slots a day. A battery charges in low-price slots and discharges in high-price slots; solar pushes daytime prices down and the evening peak pushes them up, and that spread is the source of arbitrage revenue. Monthly spreads by area are in our Market Notes.
Read more: Battery Revenue Stacking: 3 Revenue Sources — JEPX, Balancing, Capacity · The monthly figures: Japan Battery Storage Market Notes (Monthly)
Capacity market and the LDA (OCCTO)
The main auction pays power sources for being available in a delivery year, with contracts of in principle one year, so the clearing price moves every year. The Long-Term Decarbonized Power Source Auction (LDA) is limited to new build, replacement and renovation and pays fixed income for 20 years in principle; a 2 MW / 8 MWh high-voltage project cannot meet its 30 MW minimum, so it runs as full merchant.
The full guide: Japan Capacity Market, LDA & Tolling Guide · Columns: Capacity Market Main Auction and Batteries: Unit Prices (Clearing Prices) · Long-Term Decarbonization Power Source Auction (LDA): Explained and Results · What Is Full Merchant? When Batteries Run on Market Revenue
Revenue and cost together
How the three markets stack, how revenue differs by area, and what a plant costs per kWh are covered in one guide.
The full guide: Battery Revenue Stacking and Cost in Japan
Equipment — JC-STAR ★1
A Grid Code revision that would require JC-STAR ★1 products (PCS, EMS, gateways and other IP-communicating devices, not the battery cells) is in motion: from April 2027 at extra-high and high voltage, keyed to the contract application. The direction is fixed; the guideline that would carry the rule had not been promulgated when our column was written.
Read more: JC-STAR ★1 Requirement for Grid Batteries in Japan
3. Grid connection and the site
The steps
Our development column splits a project into five phases — site screening; land, residents and permits; connection study and contract; design and procurement; construction and interconnection — and puts the whole at least 2 years, typically 3 to 5. Buying a project that already has a connection study response and secured land starts you at phase 4.
On the grid side the order is: connection study → contract application → connection approval → cost contribution contract (within one month of approval) → construction → connection. Three rules shape the timing today:
- A connection study response lapses one year after the response date if no contract application is filed.
- For contract applications accepted from October 1, 2026 (FIT and FIP sources excluded), documents proving the right to use the site are due in principle within two months of connection approval, or the connection reservation is cancelled.
- From August 1, 2026, each transmission and distribution company caps the number of connection studies per company for grid-scale batteries.
Read more: Battery Storage Development — 5 Phases to Grid Connection · New Grid Connection Study Rules for BESS — April 2026
Cost and curtailment
Of the grid connection costs, the construction cost contribution is the item that varies by orders of magnitude with location. Our column names three drivers: distance to the grid, the two-way capacity a battery needs for charging and discharging, and speculative reservation of connection studies. Since April 2023, new connections other than low-voltage ones under 10 kW are non-firm in principle, so output — and for a battery, charging too — can be curtailed when the grid is congested.
Read more: Why Battery Grid Connection Costs Vary by 10x — Location · Non-Firm Connection — Curtailment Risk to Battery Revenue
Site risk
Night-time noise from cooling and PCS fans, flood and landslide hazard, who fixes the DC side when the plant stops, and how the insurance is built are the usual sources of trouble at a storage site.
The full guide: Battery Storage Noise and Siting Risk in Japan
4. Ways to acquire a project
On our listings a project is sold in one of two forms:
- Transfer of rights (development rights) — the land rights and the grid position (connection study response, contract application, cost contribution). The buyer builds the plant.
- Completed-build handover — the plant is built by the seller side and handed over with the equipment and the land or land-use rights.
Beyond the two, our columns also cover buying the SPC that owns the plant, and buying an operating plant with a trading record. Which form fits depends on what the buyer can build and what risk it can carry; the stage of the project (study response, connection approved, operating) moves the price more than the grid area does.
The full guide: Buy or Sell a Battery Storage Plant in Japan · Columns: Four Ways to Buy a Battery Storage Plant in Japan · Battery Development Rights Transfer — Steps and Key Points · Buying Grid-Scale Battery Storage — 40+ Technical Checks
5. Market data and the monthly Market Notes
- Market data — the projects we list, counted by grid area, prefecture, voltage, structure, size and expected connection. Recounted every morning; tables also as CSV. No prices.
- Battery Storage Market Notes — a monthly report on the balancing, JEPX and capacity markets from published data, with sources and a PDF. Each issue is named after the month it is published: the November 2026 issue covers October 2026.
- Market data for the Notes — the series behind the Notes, as CSV.
- Market research — the entry page for both.
6. Projects for sale on Chikudensho Market
Chikudensho Market is our marketplace for grid-scale battery projects in Japan, with English screens. Without registering you can see each listed project's prefecture, size, voltage, sale type, procedural stage and expected start of operation. Prices and documents are available after a free registration, in which the confidentiality undertaking is agreed on screen.
→ See projects for sale on Chikudensho Market
Columns in this guide (15)
Each column gives the data window and sources for its figures.
- Battery Revenue Stacking: 3 Revenue Sources
- Japan's Balancing Market
- What Is EPRX
- Capacity Market Main Auction and Batteries: Unit Prices (Clearing Prices)
- Long-Term Decarbonization Power Source Auction (LDA): Explained and Results
- What Is Full Merchant? When Batteries Run on Market Revenue
- Battery Storage Development
- Why Battery Grid Connection Costs Vary by 10x
- New Grid Connection Study Rules for BESS
- Non-Firm Connection
- Four Ways to Buy a Battery Storage Plant in Japan
- Battery Development Rights Transfer
- Buying Grid-Scale Battery Storage
- Japan's Grid-Scale Storage
- JC-STAR ★1 Requirement for Grid Batteries in Japan
Frequently asked questions
No. A grid-scale battery earns from the balancing market, wholesale power and the capacity market. The Long-Term Decarbonized Power Source Auction (LDA), run by OCCTO, pays fixed income for 20 years in principle and has a 30 MW minimum. A tolling contract is a separate route to a fixed fee: the owner hands the battery's capacity and dispatch rights to a counterparty. See Capacity market, LDA and tolling.
Read more: Battery Revenue Stacking: 3 Revenue Sources — JEPX, Balancing, Capacity
ANRE's figures for the end of June 2026: 1.28 GW of grid-scale batteries connected, about 211 GW of connection studies and about 41 GW of contract applications received. Not every connection study leads to a grid connection (ANRE). Projects that already hold a connection study response are for sale on Chikudensho Market.
Read more: New Grid Connection Study Rules for BESS — April 2026
Foreign capital does buy projects, but there are gates before the purchase: moving funds out of the home country, inward investment rules under FEFTA, scarce grid capacity and land, equipment, and tax. Our column reads a grid-scale storage plant as a designated sector under FEFTA, so prior notification is likely. Whether and how it applies to your structure is a question for your own legal counsel, case by case.
Read more: Japan's Grid-Scale Storage — Gates Foreign Capital Clears
In a transfer of rights you buy the land rights and the grid position and build the plant yourself. In a completed-build handover the plant is built on the seller side and handed over with the equipment. The gap between the two is mostly construction cost.
Read more: Buy or Sell a Battery Storage Plant in Japan
At least 2 years, typically 3 to 5, from site screening to interconnection, in our development column. A connection study response lapses one year after the response date if no contract application is filed.
Read more: Battery Storage Development — 5 Phases to Grid Connection
Not on this site. Prices and documents for each listed project are on Chikudensho Market after a free registration.
What to do next
- If you are buying — the projects we list are on Chikudensho Market, open to view without registration; prices and documents follow a free registration. → Chikudensho Market
- If you are selling — if you hold a project with a connection study response, we either buy it ourselves or introduce you to a buyer. → Contact us
- To read further — Japan Battery Storage Market: BESS Investment Guide 2026 · Knowledge — Grid Battery Regulation, Technology & Business · Grid-Scale Battery Storage in Japan — A Beginner's Q&A