A grid-scale battery (a large battery connected to the transmission grid that stores electricity and releases it) earns money in two ways. It sells the "capability" to fix electricity surpluses and shortages. It also uses the price differences that come from electricity prices changing by time of day. These notes use published figures and our own records to show this month's movements in figures and tables. This issue is a back issue, produced in November 2026. The grid connection study totals are as of when we produced it (October 19, 2026).
Science X Inc. · Published November 5, 2026 · A4, 13 pages
A battery storage plant (grid-scale battery) earns income from three markets. ① The balancing market (EPRX) is where the plant sells the capability to fix electricity surpluses and shortages to grid operators. ② Wholesale electricity (JEPX) is where it buys electricity when it is cheap, stores it, and sells it when it is expensive. ③ The capacity market (OCCTO) is where the country buys future electricity supply capacity in advance. These notes present the figures in that order. The ①, ② or ③ at the start of each section title shows which market the section covers.

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).
We picked three movements this month from the figures of the three markets.
The balancing market is where grid operators buy the capability to fix electricity surpluses and shortages, every 30 minutes. Products are split by how fast output must change (Primary reserve responds to changes in frequency; Secondary and Tertiary reserves respond to instructions from the grid operator). Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve senses frequency changes by itself and responds. It has two categories, "online" and "offline". Online means the grid operator monitors the response over a dedicated line. Offline means no dedicated line is installed, and a record of the response is submitted afterwards. The two categories are tendered and traded separately, so we show them separately. A Composite product is a bid that combines several products. Prices are set in yen per 1 kW of available capability per 30 minutes. kW is a unit for how much power can be delivered. It is different from kWh, which measures an amount of electricity. Each 30-minute trading round is called a "30-minute slot". The figure shows the range of winning prices by area (by the area where the power source is located). The thin line runs from the cheapest to the most expensive winning bid in the month. The thick band is the price range that holds 8 out of every 10 slots with winning bids. The dot is the average winning price. Nationwide figures are in the tables in the "Market figures" section.
By area where the power source is located, the highest average winning price in the balancing market was Primary reserve (offline) in Chubu, at 14.57 yen/kW per 30 min. The lowest was Tertiary reserve 2 in Shikoku, at 0.37 yen/kW per 30 min.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
| Product | Response time | Duration |
|---|---|---|
| Primary reserve (online) | Within 10 seconds | 5 minutes or more |
| Primary reserve (offline) | Within 30 seconds | No set duration |
| Secondary reserve 1 | Within 5 minutes | 30 minutes |
| Secondary reserve 2 | Within 5 minutes | 30 minutes |
| Tertiary reserve 1 | Within 15 minutes | 30 minutes |
| Tertiary reserve 2 | Within 60 minutes | 30 minutes |
| Composite product | Requirements of the combined products | Requirements of the combined products |
The award rate is the share of the bid volume that won. The higher it is, the more easily bids win. The figure shows the award rate of each product by time of day (every 30 minutes), for each grid area (area where the power source is located). Where a line is broken, there were no bids at that time.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
Primary reserve is the fastest product. It responds to frequency changes by changing output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left side shows the online category and the right side the offline category. The bars show the bid ratio (bid volume ÷ volume requested by grid operators). Above 100% means more bids came in than were requested. Even below 100%, some bids do not win (see the award rate in the "Market figures" table). The bars rise when bids increase, and also when the requested volume falls. The line is the average winning price. These are monthly figures from April 2025, the data we have.
For Primary reserve (online) in the balancing market, this month's bid ratio was 74.3% (no month has gone above 100% yet), and the average winning price was 4.27 yen/kW per 30 min. The requested volume was 3,066.1 MW in April 2025 and 1,598.4 MW this month. For Primary reserve (offline), this month's bid ratio was 30.9%, and the average winning price was 12.29 yen/kW per 30 min. The requested volume was 1,122.5 MW in April 2025 and 500.6 MW this month.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
These are the average winning prices by product since April 2025 (monthly averages weighted by winning volume). From March 14, 2026, Primary reserve through Tertiary reserve 1 and the Composite product switched from trading every 3 hours to trading every 30 minutes (Tertiary reserve 2 was already traded every 30 minutes).
The average winning price of Primary reserve (online) in the balancing market was 2.89 yen in April 2025 and 4.27 yen this month. The highest was 4.90 yen in February 2026 (yen/kW per 30 min). Tertiary reserve 2 was 1.12 yen in April 2025 and 3.03 yen this month (yen/kW per 30 min), with this month the highest. For the other products, the highest month was July 2025.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
These are the average winning prices by hour for each product in April 2026 (1st–30th).
For Primary reserve (online) in the balancing market, the most expensive hour was around 18:00 at 5.37 yen, and the cheapest was around 0:00 at 3.17 yen (yen/kW per 30 min). For Tertiary reserve 2, the highest was 5.29 yen around 6:00, and the lowest was 0.84 yen around 3:00 (yen/kW per 30 min).

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
The figure shows the share of the winning volume held by batteries. The table compares the average winning price of the volume won by batteries with the average winning price of the product as a whole.
In the balancing market, the battery share was 98.2% for Primary reserve (offline), 22.0% for Primary reserve (online) and 0.3% for Tertiary reserve 2. The average winning price of the volume won by batteries was 9.02 yen for Primary reserve (online) (overall 4.27 yen) and 46.42 yen for Tertiary reserve 2 (overall 3.03 yen) (yen/kW per 30 min).

Source: Trading results (preliminary) by power source type published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
| Product | Volume won by batteries (yen/kW per 30 min) | Product as a whole (yen/kW per 30 min) |
|---|---|---|
| Primary reserve (online) | 9.02 | 4.27 |
| Primary reserve (offline) | 12.25 | 12.29 |
| Secondary reserve 1 | 9.54 | 2.96 |
| Secondary reserve 2 | 9.91 | 2.65 |
| Tertiary reserve 1 | 9.46 | 2.53 |
| Tertiary reserve 2 | 46.42 | 3.03 |
| Composite product | 9.00 | 2.91 |
Both are averages weighted by winning volume (April 2026, preliminary, nationwide). Batteries account for only 0.3% of the winning volume of Tertiary reserve 2. In the slots where batteries won, the nationwide average winning price, weighted by the batteries' winning volume, was 5.41 yen. The batteries' average is high not because they are concentrated in high-priced slots. It is high because the batteries' own bid prices are high (each winning bid is settled at its own bid price).
We ranked the month's 30-minute slots with winning bids by revenue (average winning price × winning volume, nationwide). For each product, we plotted what share of the month's revenue the top slots account for. The further the curve bulges above the dotted line, the more revenue is concentrated in a few slots. Tertiary reserve 2 is a product that covers errors in forecasting renewable generation caused by the weather. Its price is low in most slots and high in only a few.
In the balancing market, the top 10% of slots by revenue accounted for 60.2% of the month's revenue for Tertiary reserve 2, and 16.0% for Primary reserve (online). The top 1% of slots accounted for 9.0% for Tertiary reserve 2 and 1.9% for Primary reserve (online).

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our aggregation.
In April 2026, there were 1,259 slots with winning bids. The top 1% of them by revenue (average winning price × winning volume) accounted for 9.0% of the month's revenue. There were 72 slots where the nationwide average winning price was 10 yen/kW per 30 min or more, and 181 slots with no winning bids.
Slots with the highest maximum winning prices (by area where the power source is located). The maximum winning price is the price of the single highest winning bid. The average winning price for the same slot and area is shown to its right:
| Date | Time | Area | Maximum winning price (yen/kW per 30 min) | Average winning price for the same slot and area (yen/kW per 30 min) |
|---|---|---|---|---|
| April 1 | 14:30 | Chubu | 200.00 | 49.49 |
| April 2 | 11:30 | Chubu | 200.00 | 11.05 |
| April 2 | 12:00 | Chubu | 200.00 | 11.17 |
| April 2 | 13:00 | Chubu | 200.00 | 47.39 |
| April 2 | 13:30 | Chubu | 200.00 | 46.42 |
Wholesale electricity is the electricity that power companies and retailers buy and sell. Its price is set on the "spot market" of the Japan Electric Power Exchange (JEPX), where electricity for the next day is traded the day before. "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When the transmission lines between regions are congested, prices split by area, from Hokkaido to Kyushu (area prices).
The monthly average wholesale price for System (nationwide) was 14.77 yen/kWh this month (April 2026), and 9.82 yen/kWh in the same month last year.

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our aggregation.
Wholesale prices change every 30 minutes. The figure shows the shape of a day, averaging prices at the same time of day across the month. If a battery charges at cheap times and discharges at expensive times, the difference becomes its income.
On the daily average, both Tokyo and Kyushu hit their low around 12:30 and their peak around 18:30. Tokyo was 11.42 yen/kWh and 33.06 yen/kWh, and Kyushu was 3.50 yen/kWh and 17.19 yen/kWh.

Source: JEPX spot market. Our aggregation.
For each area, we took the average price of the day's 4 most expensive hours minus the average price of its 4 cheapest hours, and show the monthly average. This is the difference per kWh if you buy 1 kWh in the 4 cheapest hours and sell it in the 4 most expensive hours. It is a simple difference. Electricity lost in charging and discharging and fees are not deducted, and the order of the cheap and expensive hours is not considered.
By area, the monthly average spread between the 4 most expensive and 4 cheapest hours was largest in Tokyo, at 23.12 yen/kWh, and smallest in Shikoku, at 9.41 yen/kWh.

Source: JEPX spot market. Our aggregation.
| Area | 2-hour spread (yen/kWh) | 4-hour spread (yen/kWh) | Days with a 4-hour spread of 10 yen or more |
|---|---|---|---|
| System (nationwide) | 16.89 | 15.32 | 24 |
| Hokkaido | 21.76 | 19.73 | 26 |
| Tohoku | 23.11 | 21.14 | 26 |
| Tokyo | 28.72 | 23.12 | 29 |
| Chubu | 20.67 | 18.40 | 27 |
| Hokuriku | 14.74 | 12.82 | 20 |
| Kansai | 14.29 | 12.41 | 20 |
| Chugoku | 14.31 | 12.65 | 20 |
| Shikoku | 10.82 | 9.41 | 11 |
| Kyushu | 14.07 | 13.02 | 21 |
The spread is the monthly average of the daily differences. April 2026 covers 30 days.
This is the same 4-hour spread, shown day by day. The bigger the spread on a day, the more room a battery has to earn from it.
The 4-hour spread was 10 yen/kWh or more on 24 of 30 days for System (nationwide). By area, Tokyo had the most such days, at 29, and Shikoku the fewest, at 11.

Source: JEPX spot market. Our aggregation.
The capacity market buys electricity supply capacity for 4 years ahead through an auction held once a year. Prices are set in yen per kW per year. The left figure shows past main auction clearing prices. The right figure shows the capacity of batteries and pumped hydro contracted in the Long-Term Decarbonization Power Source Auction (a separate auction that promises capacity income, in principle for 20 years, for things such as new decarbonized power sources). These are published once a year, so they do not change every month. The latest is for delivery FY2029 (published January 2026).
The Tokyo clearing price in the capacity market main auction was 14,137 yen/kW for delivery FY2024, 3,495 yen/kW for FY2025 and 15,111 yen/kW for FY2029. In the Long-Term Decarbonization Power Source Auction, the contracted capacity of batteries and pumped hydro in the FY2025 auction was 819 MW for lithium-ion batteries and pumped hydro (excluding new builds), and 886 MW for non-lithium-ion batteries, pumped hydro (new builds) and LDES. Both are the latest annual figures, so they do not change every month.

Source: Clearing results and capacity assurance contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (links in the last section (Assumptions and terms)). As published.
We have no records for this month, because it is before we started Chikudensho Market (from May 2026).
A grid connection study is the procedure where you ask the grid operator to check "whether you can connect at this site, and how much the work will cost". The grid connection cost contribution is the part of the connection work cost paid by the applicant. From the response letters we received, we took only the high-voltage cases (connecting to 6,600 V distribution lines) and grouped them by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.
In the grid connection study responses (high voltage only, as of October 19, 2026), the median construction period was shortest in Tokyo, at 8.0 months, and longest in Tohoku, at 17.0 months. The grid connection cost contribution was smallest in Tokyo, at ¥3.02 million, and largest in Tohoku, at ¥32.35 million.

Source: Our aggregation of the high-voltage grid connection study response letters we received from general transmission and distribution operators (as of October 19, 2026).
We have put the numbers behind the figures above into tables you can use in your materials: ① nationwide figures by product for the balancing market (bid ratio, award rate, price, battery share), ② figures by area and trading volume for wholesale electricity (JEPX), and ③ capacity market clearing prices.
Balancing market (April 2026, preliminary, nationwide)
| Product | Requested volume (MW) | Bid volume (MW) | Winning volume (MW) | Bid ratio (bids ÷ requested) | Award rate (won ÷ bids) | Average winning price (yen/kW per 30 min) | Battery share |
|---|---|---|---|---|---|---|---|
| Primary reserve (online) | 1,598.4 | 1,187.4 | 1,041.7 | 74.3% | 87.7% | 4.27 | 22.0% |
| Primary reserve (offline) | 500.6 | 154.8 | 132.3 | 30.9% | 85.5% | 12.29 | 98.2% |
| Secondary reserve 1 | 1,385.2 | 2,046.6 | 1,226.1 | 147.7% | 59.9% | 2.96 | 1.4% |
| Secondary reserve 2 | 1,452.3 | 3,098.5 | 2,306.9 | 213.3% | 74.5% | 2.65 | 0.7% |
| Tertiary reserve 1 | 3,446.8 | 4,956.2 | 3,381.0 | 143.8% | 68.2% | 2.53 | 0.5% |
| Tertiary reserve 2 | 861.7 | 1,926.8 | 793.2 | 223.6% | 41.2% | 3.03 | 0.3% |
| Composite product | 4,276.4 | 5,259.2 | 3,681.3 | 123.0% | 70.0% | 2.91 | 6.3% |
Volumes are averages per 30-minute slot. Products with a bid ratio below 100% did not get enough bids for the requested volume. The award rate is the share of the bid volume that won.
Wholesale electricity, JEPX spot market (April 2026, by area, yen/kWh)
| Area | Monthly average | Same month last year | Daytime (8:00–16:00) | Evening (16:00–20:00) | 4-hour spread | Maximum | Slots at 30 yen or more | Slots at 0.01 yen |
|---|---|---|---|---|---|---|---|---|
| System (nationwide) | 14.77 | 9.82 | 9.20 | 20.31 | 15.32 | 35.00 | 21 | 89 |
| Hokkaido | 13.96 | 9.95 | 6.18 | 20.00 | 19.73 | 50.00 | 37 | 184 |
| Tohoku | 14.57 | 10.36 | 6.37 | 21.08 | 21.14 | 50.00 | 54 | 184 |
| Tokyo | 20.06 | 11.45 | 15.16 | 28.53 | 23.12 | 64.28 | 159 | 28 |
| Chubu | 17.85 | 9.83 | 12.88 | 22.72 | 18.40 | 44.70 | 92 | 58 |
| Hokuriku | 13.23 | 9.57 | 11.47 | 17.00 | 12.82 | 44.70 | 32 | 60 |
| Kansai | 13.12 | 9.44 | 11.19 | 16.89 | 12.41 | 37.54 | 22 | 61 |
| Chugoku | 12.26 | 9.37 | 9.18 | 15.86 | 12.65 | 37.54 | 7 | 82 |
| Shikoku | 7.73 | 8.76 | 4.79 | 8.99 | 9.41 | 31.03 | 2 | 169 |
| Kyushu | 10.61 | 8.52 | 5.71 | 14.63 | 13.02 | 35.00 | 1 | 180 |
Trading volume (April 2026, total for 30 days): total contracted volume 27,138 million kWh (same month last year 20,785 million kWh), sell bids 44,311 million kWh, buy bids 33,363 million kWh.
Capacity market main auction area prices (yen/kW per year)
| Delivery fiscal year | Hokkaido | Tohoku | Tokyo | Chubu | Hokuriku | Kansai | Chugoku | Shikoku | Kyushu |
|---|---|---|---|---|---|---|---|---|---|
| FY2024 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 |
| FY2025 | 5,242 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 5,242 |
| FY2026 | 8,749 | 5,833 | 5,834 | 5,832 | 5,832 | 5,832 | 5,832 | 5,832 | 8,748 |
| FY2027 | 13,287 | 9,044 | 9,555 | 7,823 | 7,638 | 7,638 | 7,638 | 7,638 | 11,457 |
| FY2028 | 14,812 | 14,812 | 14,812 | 10,280 | 8,785 | 8,785 | 8,785 | 8,785 | 13,177 |
| FY2029 | 14,972 | 15,111 | 15,111 | 12,388 | 12,388 | 12,388 | 12,388 | 12,388 | 15,112 |
Contracted capacity of batteries and pumped hydro in the Long-Term Decarbonization Power Source Auction (10,000 kW)
| Auction year | Category | Contracted capacity (10,000 kW) |
|---|---|---|
| FY2023 auction | Batteries and pumped hydro | 166.9 |
| FY2024 auction | Continuous operation of 3 hours or more and less than 6 hours | 96.1 |
| FY2024 auction | Continuous operation of 6 hours or more | 76.9 |
| FY2025 auction | Lithium-ion batteries and pumped hydro (excluding new builds) | 81.9 |
| FY2025 auction | Non-lithium-ion batteries, pumped hydro (new builds) and LDES | 88.6 |
Monthly JEPX averages and 4-hour spreads by area, and capacity market area prices, laid out across issues. CSV downloads included.
You are welcome to quote the figures and charts on this page. Please give the source as follows.
Source: Science X Inc., “Battery Storage Market Notes, April 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-04
The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.
Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →
On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).
Register free to see prices and documents → Browse projects on Chikudensho Market