Battery Storage Market Notes, May 2026 issue

"Grid-scale batteries" (large batteries connected to the power grid that store electricity and release it) earn money in two ways. They sell the "capability" to fix surpluses and shortages of electricity, and they use the price differences between times of day. These notes use published figures and our own records to show this month's trends in figures and tables. This issue is a back issue, produced retroactively in November 2026. The grid connection study totals are as of the time of production (October 19, 2026).

Science X Inc. · Published November 5, 2026 · A4, 13 pages

|

Three revenue sources for a battery storage plant (how to read these notes)

A battery storage plant (grid-scale battery) earns revenue from three markets. ① The balancing market (EPRX) is where plants sell the "capability" to fix electricity surpluses and shortages to grid operators. ② Wholesale electricity (JEPX) is where plants buy and store electricity when it is cheap and sell it when it is expensive. ③ The capacity market (OCCTO) is where the country buys future electricity supply capacity in advance. These notes present the figures in the order of these three markets. The ①, ② or ③ at the start of each section title shows which market the section covers.

Figure 1  Three revenue sources for a battery storage plant
Figure 1 Three revenue sources for a battery storage plant

Source: Rules of the Japan Electric Power Exchange (JEPX), Electric Power Reserve Exchange (EPRX) and Organization for Cross-regional Coordination of Transmission Operators (OCCTO).

Three trends this month

We picked three trends this month from the figures for the three markets.

① Balancing market (EPRX) | Seven products and prices by area

The balancing market is where grid operators buy, every 30 minutes, the "capability" to fix electricity surpluses and shortages. Products are divided by how quickly output can be changed (Primary reserve responds to changes in frequency; Secondary and Tertiary reserve respond to instructions from the grid operator). Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve is a product that senses changes in frequency on its own and responds. It has two categories, shown separately because they are offered and traded separately: "online", where the grid operator monitors operation through a dedicated line, and "offline", where no dedicated line is installed and the operating record is submitted afterwards. A Composite product is a bid that bundles several products together. Prices are set in yen per 1 kW of available capability per 30 minutes. kW is a unit of how much power can be delivered, which is different from kWh, the amount of electricity. Each 30-minute trading round is called a "30-minute slot". The figure shows the range of winning prices by area (by the area where the power source is located). The thin line runs from the cheapest bid to the most expensive bid in the month, the thick band is the price range covering 8 out of 10 slots with awards, and the dot is the average winning price. Nationwide figures are in the table in the "Market figures" section.

By area, the highest average winning price in the balancing market was 14.86 yen/kW per 30 min for Primary reserve (offline) in Tohoku, and the lowest was 0.33 yen/kW per 30 min for Tertiary reserve 2 in Shikoku.

Figure 2  Range and average of winning prices in the balancing market by area (May 2026 (1st–31st), by area where the power source is located)
Figure 2 Range and average of winning prices in the balancing market by area (May 2026 (1st–31st), by area where the power source is located)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

ProductResponse timeDuration
Primary reserve (online)Within 10 seconds5 minutes or more
Primary reserve (offline)Within 30 secondsNo set duration
Secondary reserve 1Within 5 minutes30 minutes
Secondary reserve 2Within 5 minutes30 minutes
Tertiary reserve 1Within 15 minutes30 minutes
Tertiary reserve 2Within 60 minutes30 minutes
Composite productRequirements of the combined productsRequirements of the combined products

① Balancing market (EPRX) | Grid areas and times where bids win more easily

The award rate is the share of bid volume that wins. The higher it is, the more easily bids win. The figure plots the award rate for each product by time of day (every 30 minutes), for each grid area (the area where the power source is located). Where a line breaks, there were no bids at that time.

Figure 3  Award rate in the balancing market (grid area (where the power source is located) × time of day, May 2026 (1st–31st))
Figure 3 Award rate in the balancing market (grid area (where the power source is located) × time of day, May 2026 (1st–31st))

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | How full are the Primary reserve seats?

Primary reserve is the fastest product. It responds to changes in frequency and changes output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left side shows the online category and the right side the offline category. The bars show the bid-to-procurement ratio (bid volume ÷ volume procured by grid operators). Above 100% means more bids came in than were procured. Even below 100%, some bids do not win (the award rate is in the "Market figures" table). A bar rises when bids increase or when the procured volume falls. The line shows the average winning price. These are monthly figures from April 2025, the earliest we have.

In the balancing market, Primary reserve (online) had a bid-to-procurement ratio of 71.0% this month and an average winning price of 4.84 yen/kW per 30 min. Primary reserve (offline) had a bid-to-procurement ratio of 40.4% and an average winning price of 12.53 yen/kW per 30 min. For both, no month has yet had a ratio above 100%. Procured volume for Primary reserve (online) was 3,066.1 MW in April 2025 and 1,581.1 MW this month; for Primary reserve (offline) it was 1,122.5 MW in April 2025 and 498.2 MW this month.

Figure 4  Primary reserve bid-to-procurement ratio (bars) and average winning price (line) (monthly; left is online, right is offline; gold bars are months when bids exceeded the procured volume)
Figure 4 Primary reserve bid-to-procurement ratio (bars) and average winning price (line) (monthly; left is online, right is offline; gold bars are months when bids exceeded the procured volume)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | How prices have moved by product

These are average winning prices by product from April 2025 (monthly averages weighted by awarded volume). From March 14, 2026, Primary through Tertiary reserve 1 and Composite product moved from trading in 3-hour blocks to trading every 30 minutes (Tertiary reserve 2 was already traded every 30 minutes).

In the balancing market, the average winning price for Tertiary reserve 2 went from 1.12 yen/kW per 30 min in April 2025 to 4.18 yen/kW per 30 min this month, with this month the highest. For Primary reserve (online), it went from 2.89 yen/kW per 30 min to 4.84 yen/kW per 30 min, and the highest was 4.90 yen/kW per 30 min in February 2026.

Figure 5  Average winning price by product in the balancing market (yen/kW per 30 min, monthly)
Figure 5 Average winning price by product in the balancing market (yen/kW per 30 min, monthly)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | Which hours of the day are expensive?

These are hourly average winning prices by product for May 2026 (1st–31st).

The highest and lowest hours for the average winning price in the balancing market were 5.93 yen around 18:00 and 3.93 yen around 2:00 for Primary reserve (online), and 14.57 yen around 5:00 and 0.64 yen around 2:00 for Tertiary reserve 2 (yen/kW per 30 min).

Figure 6  Average winning price by time of day in the balancing market (May 2026 (1st–31st), yen/kW per 30 min)
Figure 6 Average winning price by time of day in the balancing market (May 2026 (1st–31st), yen/kW per 30 min)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | Which products use batteries?

The figure shows the share of awarded volume taken by batteries. The table compares the average winning price of the volume won by batteries with the average winning price for the product as a whole.

In the balancing market, batteries had a 28.2% share of Primary reserve (online). The average winning price of the volume won by batteries was 9.83 yen/kW per 30 min, against 4.84 yen/kW per 30 min overall.

Figure 7  Share of batteries in the balancing market (%)
Figure 7 Share of batteries in the balancing market (%)

Source: Trading results (preliminary) by power source type published by the Electric Power Reserve Exchange (EPRX). Our totals.

ProductVolume won by batteries (yen/kW per 30 min)Product as a whole (yen/kW per 30 min)
Primary reserve (online)9.834.84
Primary reserve (offline)12.5012.53
Secondary reserve 111.232.95
Secondary reserve 212.492.54
Tertiary reserve 112.492.47
Tertiary reserve 248.224.18
Composite product9.783.07

Both are averages weighted by awarded volume (May 2026, preliminary, nationwide). The battery portion of Tertiary reserve 2 is only 0.5% of awarded volume. The nationwide average winning price in the 30-minute slots where batteries won is 8.04 yen, weighted by battery awarded volume. The battery average is higher not because batteries are concentrated in high-priced slots, but because the battery bids themselves are priced higher (each winning bid is settled at its own bid price).

① Balancing market (EPRX) | Revenue is concentrated in a small number of slots

We ranked the month's 30-minute slots with awards by revenue (average winning price × awarded volume, nationwide), from highest to lowest, and plotted for each product what % of the month's revenue the top slots account for. The more a curve bulges above the dotted line, the more revenue is concentrated in a small number of slots. Tertiary reserve 2 is a product that covers errors in forecasting weather-dependent renewable generation. Its price is low in most slots and high in only a very small number.

In the balancing market, the share of revenue concentrated in the top 10% of slots was 54.2% of the month's revenue for Tertiary reserve 2 and 14.7% of the month's revenue for Primary reserve (online).

Figure 8  Share of balancing market revenue concentrated in the top slots (May 2026 (1st–31st), nationwide)
Figure 8 Share of balancing market revenue concentrated in the top slots (May 2026 (1st–31st), nationwide)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our totals.

In May 2026, out of 1,249 slots with awards, the top 1% of slots by revenue (average winning price × awarded volume) accounted for 7.1% of the month's revenue. 146 slots had a nationwide average winning price of 10 yen/kW per 30 min or more, and 239 slots had no awards.

Slots with the highest top winning price (by area where the power source is located). The top winning price is the price of the single most expensive winning bid. The average winning price for the same slot and area is shown on the right:

DayTimeAreaTop winning price (yen/kW per 30 min)Average winning price in the same slot and area (yen/kW per 30 min)
May 1214:00Kansai138.234.07
May 1214:30Kansai138.234.07
May 19:00Tokyo97.0068.67
May 19:30Tokyo97.0068.58
May 110:00Tokyo97.0056.84

② Wholesale electricity (JEPX) | Average prices

Wholesale electricity is the electricity bought and sold between power companies and retailers. Its price is set on the "spot market" of the Japan Electric Power Exchange (JEPX), where electricity for the next day is traded the day before. "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When the transmission lines between regions become congested, prices split by area from Hokkaido to Kyushu (area prices).

The monthly average system price for wholesale electricity (JEPX), System (nationwide), was 14.06 yen/kWh, against 8.92 yen/kWh in the same month last year, a difference of 5.14 yen/kWh.

Figure 9  Average wholesale electricity price (yen/kWh). Navy is May 2026, grey is the same month last year
Figure 9 Average wholesale electricity price (yen/kWh). Navy is May 2026, grey is the same month last year

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our totals.

② Wholesale electricity (JEPX) | How prices move during the day

Wholesale electricity prices change every 30 minutes. The figure shows the shape of a day, averaging prices at the same time across the month. If a battery stores electricity at cheap times and releases it at expensive times, the difference becomes the battery's revenue.

Within the day, average prices ranged from 9.96 yen/kWh around 7:00 to 28.79 yen/kWh around 18:30 in Tokyo, and from 1.46 yen/kWh around 12:00 to 19.98 yen/kWh around 18:30 in Kyushu.

Figure 10  Daily peaks and troughs in wholesale electricity prices (May 2026 average, yen/kWh)
Figure 10 Daily peaks and troughs in wholesale electricity prices (May 2026 average, yen/kWh)

Source: JEPX spot market. Our totals.

② Wholesale electricity (JEPX) | How large is the spread per kWh?

We took the average price of the day's most expensive 4 hours minus the average price of its cheapest 4 hours, and show the monthly average by area. This equals the difference per kWh from buying 1 kWh in the cheapest 4 hours and selling it in the most expensive 4 hours. It is a simple difference: it does not deduct electricity lost in charging and discharging or fees, and it ignores the order of the cheap and expensive hours.

By area, the largest monthly average spread between the most expensive 4 hours and the cheapest 4 hours was 21.14 yen/kWh in Tohoku, and the smallest was 12.97 yen/kWh in Shikoku.

Figure 11  Wholesale electricity spread: average of the most expensive 4 hours − average of the cheapest 4 hours (May 2026, yen/kWh, monthly average)
Figure 11 Wholesale electricity spread: average of the most expensive 4 hours − average of the cheapest 4 hours (May 2026, yen/kWh, monthly average)

Source: JEPX spot market. Our totals.

Area2-hour spread (yen/kWh)4-hour spread (yen/kWh)Days with a 4-hour spread of 10 yen or more
System (nationwide)18.4116.4027
Hokkaido22.0019.7731
Tohoku23.5521.1431
Tokyo21.8918.0029
Chubu17.9915.8826
Hokuriku15.8013.7223
Kansai15.8013.7323
Chugoku17.3215.4526
Shikoku14.7712.9721
Kyushu17.9816.6428

The spread is the monthly average of the daily differences. May 2026 covers 31 days.

② Wholesale electricity (JEPX) | There is a spread every day

This shows the same 4-hour spread day by day. The larger the spread on a day, the more room a battery has to earn from it.

Days with a 4-hour spread of 10 yen or more numbered 27 out of 31 in System (nationwide), 31 out of 31 in Hokkaido and Tohoku, and 21 out of 31 in Shikoku.

Figure 12  Daily wholesale electricity spread (average of the day's most expensive 4 hours − average of the cheapest 4 hours, yen/kWh)
Figure 12 Daily wholesale electricity spread (average of the day's most expensive 4 hours − average of the cheapest 4 hours, yen/kWh)

Source: JEPX spot market. Our totals.

③ Capacity market (OCCTO) | A market that buys future supply capacity

The capacity market buys electricity supply capacity four years ahead through a once-a-year auction. Prices are set in yen per kW per year. The left figure shows past main auction clearing prices. The right figure shows the battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (a separate auction that promises capacity revenue, in principle for 20 years, to new decarbonized power sources and similar). Results are published once a year, so they do not change monthly. The latest is for delivery FY2029 (published January 2026).

Capacity market main auction clearing prices for Tokyo were 14,137 yen/kW for delivery FY2024, 3,495 yen/kW for FY2025, 5,834 yen/kW for FY2026, 9,555 yen/kW for FY2027, 14,812 yen/kW for FY2028 and 15,111 yen/kW for FY2029. In the Long-Term Decarbonization Power Source Auction, awarded battery and pumped hydro capacity in the FY2025 round was 819 MW for lithium-ion batteries and pumped hydro (excluding new builds) and 886 MW for non-lithium-ion batteries, pumped hydro (new builds) and LDES. Both are annual values, so they are the latest published figures and do not change monthly.

Figure 13  Capacity market clearing prices (left, yen/kW) and battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)
Figure 13 Capacity market clearing prices (left, yen/kW) and battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)

Source: Clearing results and capacity assurance contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources in the last section (Assumptions and terms)). As published.

Our records | Where are battery storage projects increasing?

We counted, by grid area, the projects newly listed this month in our Chikudensho Market (our marketplace for battery storage sites, a site where we list battery storage projects for buyers). These figures are for projects we handled, not for the whole market. Transfer of rights is a sale that transfers the rights to the land and power. Completed-build handover is a sale where the facility is handed over once built.

Separately from the wholesale electricity and balancing market figures, new listings on Chikudensho Market in May 2026 were 15 projects totaling 29.9 MW. By grid area: Chubu 5 projects, 10.0 MW; Tokyo 4 projects, 7.9 MW; Tohoku 3 projects, 6.0 MW; Shikoku 1 project, 2.0 MW; Kansai 1 project, 2.0 MW; Kyushu 1 project, 2.0 MW.

Figure 14  Output of projects listed on Chikudensho Market in May 2026 (MW)
Figure 14 Output of projects listed on Chikudensho Market in May 2026 (MW)

Source: Chikudensho Market records (project locations are shown only down to the grid area; prices and parties are not shown).

Our records | How many months and how much does it take to connect to the grid?

A grid connection study is the procedure of asking the grid operator to check "can we connect at this site, and how much will the work cost?". The grid connection cost contribution is the part of the connection work cost paid by the applicant. Of the study responses we received, we totaled only the high-voltage ones (connections to a 6,600 V distribution line) by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.

Separately from the wholesale electricity and balancing market figures, the median grid connection study response (high-voltage only, as of October 19, 2026) shows construction periods from 8.0 months in Tokyo to 17.0 months in Tohoku, and grid connection cost contributions from ¥3.02 million in Tokyo to ¥32.35 million in Tohoku.

Figure 15  Median grid connection study responses (high voltage) by grid area (left: months of construction work, right: grid connection cost contribution, excluding tax)
Figure 15 Median grid connection study responses (high voltage) by grid area (left: months of construction work, right: grid connection cost contribution, excluding tax)

Source: Our totals of high-voltage grid connection study responses received from general transmission and distribution operators (as of October 19, 2026).

Market figures (tables ready to use in your materials)

We have put the figures behind the charts into tables for use in your materials: ① nationwide figures by product for the balancing market (bid-to-procurement ratio, award rate, prices, battery share), ② figures by area and trading volume for wholesale electricity (JEPX), and ③ capacity market clearing prices.

Balancing market (May 2026, preliminary, nationwide)

ProductProcured volume (MW)Bid volume (MW)Awarded volume (MW)Bid-to-procurement ratio (bids ÷ procured)Award rate (awarded ÷ bids)Average winning price (yen/kW per 30 min)Battery share
Primary reserve (online)1,581.11,122.11,033.071.0%92.1%4.8428.2%
Primary reserve (offline)498.2201.1172.140.4%85.6%12.5399.0%
Secondary reserve 11,330.51,660.91,085.9124.8%65.4%2.952.3%
Secondary reserve 21,318.82,706.92,088.7205.2%77.2%2.540.9%
Tertiary reserve 13,153.74,205.02,975.6133.3%70.8%2.470.7%
Tertiary reserve 2551.11,326.4494.3240.7%37.3%4.180.5%
Composite product3,961.24,579.53,348.2115.6%73.1%3.078.9%

Volumes are averages per 30-minute slot. Products with a bid-to-procurement ratio below 100% are not getting enough bids for the volume procured. The award rate is the share of bid volume that wins.

Wholesale electricity, JEPX spot market (May 2026, by area, yen/kWh)

AreaMonthly averageSame month last yearDaytime (8:00–16:00)Evening (16:00–20:00)4-hour spreadHighestSlots at 30 yen or moreSlots at 0.01 yen
System (nationwide)14.068.928.4519.7216.4040.4144150
Hokkaido13.658.506.0920.5619.7740.0035210
Tohoku14.389.806.8622.2521.1450.0061219
Tokyo18.0111.1915.5723.3318.0050.0112070
Chubu16.238.4912.3420.9615.8840.4176104
Hokuriku13.947.8611.3618.2813.7240.4153114
Kansai13.947.8611.3618.2813.7340.4153118
Chugoku11.767.845.8216.6415.4540.4118213
Shikoku7.577.564.049.0712.9731.965352
Kyushu9.487.342.3114.4316.6440.4112425

Trading volume (May 2026, total for 31 days): total contracted volume 27,779 million kWh (same month last year 20,872 million kWh), sell bid volume 44,742 million kWh, buy bid volume 34,116 million kWh.

Capacity market main auction area prices (yen/kW per year)

Delivery fiscal yearHokkaidoTohokuTokyoChubuHokurikuKansaiChugokuShikokuKyushu
FY202414,13714,13714,13714,13714,13714,13714,13714,13714,137
FY20255,2423,4953,4953,4953,4953,4953,4953,4955,242
FY20268,7495,8335,8345,8325,8325,8325,8325,8328,748
FY202713,2879,0449,5557,8237,6387,6387,6387,63811,457
FY202814,81214,81214,81210,2808,7858,7858,7858,78513,177
FY202914,97215,11115,11112,38812,38812,38812,38812,38815,112

Battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (10,000 kW)

Bid yearCategoryAwarded capacity (10,000 kW)
FY2023 roundBatteries and pumped hydro166.9
FY2024 roundOperating duration of 3 hours to less than 6 hours96.1
FY2024 roundOperating duration of 6 hours or more76.9
FY2025 roundLithium-ion batteries and pumped hydro (excluding new builds)81.9
FY2025 roundNon-lithium-ion batteries, pumped hydro (new builds) and LDES88.6

Assumptions and terms

How to read the numbers in this issue

Figures across issues

How to cite

You are welcome to quote the figures and charts on this page. Please give the source as follows.

Source: Science X Inc., “Battery Storage Market Notes, May 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-05

Page: https://www.scix.co.jp/en/research/2026-05 · Updated:

The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.

Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →

Want to see the projects behind these numbers? Visit Chikudensho Market

On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).

Register free to see prices and documents → Browse projects on Chikudensho Market