A "grid-scale battery" is a large battery connected to the power grid. It stores electricity and releases it again. It earns money by selling the "capability" to correct surpluses and shortages of electricity, and by using the price differences between times of day. These notes use published figures and our own records to show this month's movements in figures and tables. This issue is a back issue, produced retroactively in November 2026. The grid connection study figures are as of the time of production (October 19, 2026).
Science X Inc. · Published November 5, 2026 · A4, 14 pages
A battery storage plant (grid-scale battery) earns revenue from three markets. ① The balancing market (EPRX) is where the "capability" to correct surpluses and shortages of electricity is sold to grid operators. ② The wholesale electricity market (JEPX) is where electricity is bought and stored at cheap times and sold at expensive times. ③ The capacity market (OCCTO) is where the country buys future electricity supply capacity in advance. These notes present the figures in the order of these three markets. The ①②③ at the start of each section title shows which market the section covers.

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).
We picked three movements this month from the figures of the three markets.
The balancing market is where grid operators buy, every 30 minutes, the "capability" to correct surpluses and shortages of electricity. Products are divided by how quickly output must change (Primary reserve responds to changes in frequency; Secondary and Tertiary reserves respond to instructions from the grid operator). Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve is a product that senses changes in frequency on its own and responds. It has two categories: "online", where the grid operator monitors operation over a dedicated line, and "offline", where no dedicated line is installed and a record of operation is submitted afterwards. They are tendered and traded separately, so we show them separately. Composite product is a bid that combines several products. Prices are set in yen per 1 kW of available capacity per 30 minutes. kW is a unit of the size of power that can be delivered, which is different from kWh, a unit of the amount of electricity. Each 30-minute trading round is called a "30-minute slot". The figure shows the range of awarded prices by area (by the area where the power source is located). The thin line runs from the cheapest bid to the most expensive bid in the month. The thick band is the price range that contains 8 out of every 10 slots with awards. The dot is the average awarded price. Nationwide figures are in the tables in the "Market figures" section.
Among the area-level average awarded prices in the balancing market, the highest was 14.66 yen/kW per 30 min for Primary reserve (offline) in Tohoku, and the lowest was 0.30 yen/kW per 30 min for Tertiary reserve 2 in Shikoku.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
| Product | Response time | Duration |
|---|---|---|
| Primary reserve (online) | Within 10 seconds | 5 minutes or more |
| Primary reserve (offline) | Within 30 seconds | No set duration |
| Secondary reserve 1 | Within 5 minutes | 30 minutes |
| Secondary reserve 2 | Within 5 minutes | 30 minutes |
| Tertiary reserve 1 | Within 15 minutes | 30 minutes |
| Tertiary reserve 2 | Within 60 minutes | 30 minutes |
| Composite product | Requirements of the combined products | Requirements of the combined products |
The award rate is the share of the bid volume that was awarded. The higher it is, the more easily bids are won. The figure plots the award rate for each product by time of day (every 30 minutes), for each grid area (the area where the power source is located). Where a line is broken, there were no bids at that time.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
Primary reserve is the fastest product. It responds to changes in frequency and changes output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left panel shows the online category and the right panel the offline category. The bars show the bid-to-offer ratio (bid volume ÷ volume tendered by the grid operator). Above 100% means more bids came in than were tendered. Even below 100%, some bids are not awarded (see the award rate in the "Market figures" table). The bars rise both when bids increase and when the tendered volume falls. The line is the average awarded price. These are monthly figures from April 2025, the data we have on hand.
In the balancing market, the bid-to-offer ratio for Primary reserve (online) was 106.8% this month, exceeding 100% for the first time. The average awarded price was 4.00 yen/kW per 30 min. The tendered volume was 3,066.1 MW in April 2025 and 1,388.0 MW this month. For Primary reserve (offline), the bid-to-offer ratio this month was 51.5% and the average awarded price 11.71 yen/kW per 30 min. The tendered volume was 1,122.5 MW in April 2025 and 497.1 MW this month.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
These are the average awarded prices for each product since April 2025 (monthly averages weighted by awarded volume). From March 14, 2026, Primary through Tertiary reserve 1 and Composite product moved from 3-hour trading to 30-minute trading (Tertiary reserve 2 was already traded every 30 minutes).
The average awarded price for Primary reserve (online) in the balancing market (yen/kW per 30 min) was 2.89 yen in April 2025 and 4.00 yen this month. The highest was 4.90 yen in February 2026. For Tertiary reserve 2, it was 1.12 yen in April 2025 and 2.45 yen this month. The highest was 4.18 yen in May 2026.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
These are the average awarded prices for each product by hour, for June 2026 (1st–30th).
The average awarded price for Primary reserve (online) in the balancing market was highest around 18:00, at 4.62 yen/kW per 30 min, and lowest around 2:00, at 3.20 yen/kW per 30 min.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
The figure shows the share of awarded volume held by batteries. The table compares the average awarded price of the volume won by batteries with the average awarded price of the product as a whole.
For Primary reserve (online) in the balancing market, the battery share was 23.5%. The average awarded price of the volume won by batteries was 9.52 yen/kW per 30 min (overall: 4.00 yen/kW per 30 min).

Source: Trading results (preliminary) by power source type, published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
| Product | Volume won by batteries (yen/kW per 30 min) | Product overall (yen/kW per 30 min) |
|---|---|---|
| Primary reserve (online) | 9.52 | 4.00 |
| Primary reserve (offline) | 11.70 | 11.71 |
| Secondary reserve 1 | 10.67 | 2.55 |
| Secondary reserve 2 | 11.41 | 2.23 |
| Tertiary reserve 1 | 11.08 | 2.11 |
| Tertiary reserve 2 | 41.95 | 2.45 |
| Composite product | 9.51 | 2.67 |
Both are averages weighted by awarded volume (June 2026, preliminary, nationwide). Batteries account for only 0.3% of the awarded volume for Tertiary reserve 2. The nationwide average awarded price of the slots that batteries won, weighted by battery awarded volume, is 5.18 yen. The battery average is high not because batteries are concentrated in high-priced slots, but because the batteries' own bid prices are high (each awarded bid is settled at its own bid price).
We ranked the month's 30-minute slots with awards by revenue (average awarded price × awarded volume, nationwide), from highest to lowest, and plotted for each product what % of the month's revenue the top slots account for. The more a curve bulges above the dotted line, the more revenue is concentrated in fewer slots. Tertiary reserve 2 is a product that covers forecast errors in renewable generation caused by weather. Its price is low in most slots and high in only a few.
In the balancing market, the top 10% of slots accounted for 47.9% of the month's revenue for Tertiary reserve 2 and 14.4% for Primary reserve (online). For the top 1%, the figures were 7.3% and 1.7%, in the same order.

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Compiled by us.
In June 2026, of the 1,199 slots with awards, the top 1% by revenue (average awarded price × awarded volume) accounted for 7.3% of the month's revenue. There were 59 slots with a nationwide average awarded price of 10 yen/kW per 30 min or more, and 241 slots with no awards.
Slots with the highest maximum awarded price (by area where the power source is located). The maximum awarded price is the price of the single highest awarded bid. The average awarded price for the same slot and area is shown to the right:
| Date | Time | Area | Maximum awarded price (yen/kW per 30 min) | Average awarded price for the same slot and area (yen/kW per 30 min) |
|---|---|---|---|---|
| June 1 | 9:30 | Tokyo | 97.00 | 46.97 |
| June 1 | 10:00 | Tokyo | 97.00 | 27.53 |
| June 2 | 9:00 | Tokyo | 97.00 | 35.54 |
| June 2 | 11:30 | Tokyo | 97.00 | 20.60 |
| June 4 | 9:00 | Tokyo | 97.00 | 17.95 |
Wholesale electricity is electricity bought and sold between power companies and retailers. Its price is set on the "spot market" of the Japan Electric Power Exchange (JEPX) (a market where electricity for the next day is traded the day before). "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When the transmission lines between regions become congested, prices split by area, from Hokkaido to Kyushu (area prices).
The monthly average for wholesale electricity, System (nationwide), was 15.10 yen/kWh, compared with 10.87 yen/kWh in the same month last year (a difference of 4.23 yen).

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Compiled by us.
Wholesale electricity prices change every 30 minutes. The figure shows the daily shape, averaging prices at the same time of day across the month. If a battery stores electricity at cheap times and releases it at expensive times, the difference becomes its revenue.
The daily low and high for wholesale electricity were 16.25 yen around 5:30 and 27.93 yen around 18:30 in Tokyo, and 5.75 yen around 12:30 and 15.05 yen around 18:30 in Kyushu.

Source: JEPX spot market. Compiled by us.
For each day, we took the average price of the 4 most expensive hours minus the average price of the 4 cheapest hours, and show the monthly average by area. This equals the difference per kWh when 1 kWh is bought in the cheapest 4 hours and sold in the most expensive 4 hours. It is a simple difference: it does not subtract electricity lost in charging and discharging or fees, and it ignores the order of the cheap and expensive hours.
The monthly average spread between the most expensive 4 hours and the cheapest 4 hours for wholesale electricity was largest in Tohoku, at 18.63 yen/kWh, and smallest in Kyushu, at 8.89 yen/kWh.

Source: JEPX spot market. Compiled by us.
| Area | 2-hour spread (yen/kWh) | 4-hour spread (yen/kWh) | Days with a 4-hour spread of 10 yen or more |
|---|---|---|---|
| System (nationwide) | 12.11 | 10.52 | 15 |
| Hokkaido | 18.90 | 16.70 | 25 |
| Tohoku | 20.71 | 18.63 | 25 |
| Tokyo | 15.65 | 12.89 | 23 |
| Chubu | 14.29 | 12.47 | 20 |
| Hokuriku | 12.81 | 10.72 | 14 |
| Kansai | 12.93 | 10.74 | 14 |
| Chugoku | 10.30 | 9.20 | 11 |
| Shikoku | 13.59 | 11.66 | 21 |
| Kyushu | 9.95 | 8.89 | 12 |
The spread is the monthly average of daily spreads. June 2026 covers 30 days.
We show the same 4-hour spread day by day. The larger the spread on a day, the more room a battery has to earn from it.
Of the 30 days, the 4-hour spread for wholesale electricity was 10 yen or more on 25 days in Hokkaido and Tohoku, 23 days in Tokyo, 15 days in System (nationwide), 12 days in Kyushu and 11 days in Chugoku.

Source: JEPX spot market. Compiled by us.
The capacity market buys electricity supply capacity for 4 years ahead through an annual auction. Prices are set in yen per kW per year. The left figure shows the clearing prices of past main auctions. The right figure shows the battery and pumped hydro capacity contracted in the Long-Term Decarbonization Power Source Auction (a separate auction that, in principle, guarantees 20 years of capacity revenue for new decarbonized power sources and similar). These are published once a year, so they do not change monthly. The latest is for delivery FY2029 (published January 2026).
The capacity market clearing prices for Tokyo for delivery FY2024–FY2029 were 14,137 yen/kW, 3,495 yen/kW, 5,834 yen/kW, 9,555 yen/kW, 14,812 yen/kW and 15,111 yen/kW. In the Long-Term Decarbonization Power Source Auction, the battery and pumped hydro capacity contracted in the FY2025 round was 819 MW for lithium-ion batteries and pumped hydro (excluding new build), and 886 MW for non-lithium-ion batteries, pumped hydro (new build) and LDES. Both are the latest figures from the once-a-year publication.

Source: Clearing results and capacity assurance contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources listed in the last section (Assumptions and terms)). As published.
We counted the projects newly listed this month on Chikudensho Market (our marketplace for battery storage sites), by grid operator's grid area. These are figures for the projects we handled, not for the whole market. Transfer of rights is a sale in which the land and grid rights are transferred. Completed-build handover is a sale in which the facility is handed over once built.
New listings on Chikudensho Market (our marketplace for battery storage sites) in June 2026 were 53 projects, 133.9 MW. By grid area, these included Kyushu with 10 projects, 48.0 MW; Chubu with 24 projects, 48.0 MW; Tokyo with 7 projects, 14.0 MW; and Kansai with 6 projects, 12.0 MW.

Source: Records of Chikudensho Market (project locations are shown only to grid area level; prices and parties are not listed).
A grid connection study is a procedure in which the grid operator examines "whether connection is possible at this location, and how much the works will cost". The grid connection cost contribution is the part of the connection works cost borne by the applicant. Of the response documents we received, we compiled only the high-voltage cases (connections to 6,600 V distribution lines) by grid area. Extra-high-voltage cases are not included. Grid areas with fewer than 5 cases are not shown.
In the high-voltage-only figures (as of October 19, 2026), the median construction period from the grid connection study ranged from 8.0 months in Tokyo to 17.0 months in Tohoku, and the median grid connection cost contribution from ¥3.02 million in Tokyo to ¥32.35 million in Tohoku.

Source: Compilation of the high-voltage grid connection study response documents we received from general transmission and distribution operators (as of October 19, 2026).
These tables give the figures behind the charts in the main text, ready for use in documents: ① nationwide figures for each balancing market product (bid-to-offer ratio, award rate, price, battery share), ② wholesale electricity (JEPX) figures by area and trading volume, and ③ capacity market clearing prices.
Balancing market (June 2026, preliminary, nationwide)
| Product | Tendered volume (MW) | Bid volume (MW) | Awarded volume (MW) | Bid-to-offer ratio (bids ÷ tendered) | Award rate (awarded ÷ bids) | Average awarded price (yen/kW per 30 min) | Battery share |
|---|---|---|---|---|---|---|---|
| Primary reserve (online) | 1,388.0 | 1,481.9 | 1,202.1 | 106.8% | 81.1% | 4.00 | 23.5% |
| Primary reserve (offline) | 497.1 | 256.1 | 175.7 | 51.5% | 68.6% | 11.71 | 99.2% |
| Secondary reserve 1 | 886.5 | 2,016.3 | 1,104.8 | 227.4% | 54.8% | 2.55 | 1.9% |
| Secondary reserve 2 | 981.7 | 3,370.4 | 2,077.0 | 343.3% | 61.6% | 2.23 | 0.7% |
| Tertiary reserve 1 | 2,263.2 | 5,484.1 | 2,929.1 | 242.3% | 53.4% | 2.11 | 0.5% |
| Tertiary reserve 2 | 542.6 | 1,386.3 | 522.9 | 255.5% | 37.7% | 2.45 | 0.3% |
| Composite product | 3,190.6 | 6,023.2 | 3,400.0 | 188.8% | 56.4% | 2.67 | 8.4% |
Volumes are averages per 30-minute slot. Products with a bid-to-offer ratio below 100% did not receive enough bids to cover the tendered volume. The award rate is the share of the bid volume that was awarded.
Wholesale electricity, JEPX spot market (June 2026, by area, yen/kWh)
| Area | Monthly average | Same month last year | Daytime (8:00–16:00) | Evening (16:00–20:00) | 4-hour spread | Maximum | Slots at 30 yen or more | Slots at 0.01 yen |
|---|---|---|---|---|---|---|---|---|
| System (nationwide) | 15.10 | 10.87 | 13.06 | 19.46 | 10.52 | 32.17 | 25 | 2 |
| Hokkaido | 14.51 | 9.37 | 8.51 | 21.22 | 16.70 | 40.00 | 24 | 81 |
| Tohoku | 15.29 | 11.05 | 9.05 | 22.51 | 18.63 | 46.00 | 54 | 115 |
| Tokyo | 20.01 | 12.96 | 20.99 | 24.60 | 12.89 | 50.01 | 118 | 0 |
| Chubu | 17.92 | 11.04 | 16.55 | 22.82 | 12.47 | 40.24 | 82 | 4 |
| Hokuriku | 13.94 | 10.68 | 14.12 | 17.36 | 10.72 | 40.14 | 35 | 4 |
| Kansai | 13.88 | 10.68 | 14.06 | 17.31 | 10.74 | 40.14 | 34 | 7 |
| Chugoku | 10.79 | 9.41 | 8.45 | 13.49 | 9.20 | 28.00 | 0 | 69 |
| Shikoku | 7.88 | 9.20 | 6.12 | 9.31 | 11.66 | 20.95 | 0 | 189 |
| Kyushu | 10.02 | 9.37 | 7.58 | 13.17 | 8.89 | 28.00 | 0 | 128 |
Trading volume (June 2026, total for 30 days): total contracted volume 28,588 million kWh (same month last year: 22,294 million kWh), sell bid volume 47,236 million kWh, buy bid volume 35,469 million kWh.
Capacity market main auction area prices (yen/kW per year)
| Delivery fiscal year | Hokkaido | Tohoku | Tokyo | Chubu | Hokuriku | Kansai | Chugoku | Shikoku | Kyushu |
|---|---|---|---|---|---|---|---|---|---|
| FY2024 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 |
| FY2025 | 5,242 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 5,242 |
| FY2026 | 8,749 | 5,833 | 5,834 | 5,832 | 5,832 | 5,832 | 5,832 | 5,832 | 8,748 |
| FY2027 | 13,287 | 9,044 | 9,555 | 7,823 | 7,638 | 7,638 | 7,638 | 7,638 | 11,457 |
| FY2028 | 14,812 | 14,812 | 14,812 | 10,280 | 8,785 | 8,785 | 8,785 | 8,785 | 13,177 |
| FY2029 | 14,972 | 15,111 | 15,111 | 12,388 | 12,388 | 12,388 | 12,388 | 12,388 | 15,112 |
Battery and pumped hydro capacity contracted in the Long-Term Decarbonization Power Source Auction (10,000 kW)
| Bid fiscal year | Category | Contracted capacity (10,000 kW) |
|---|---|---|
| FY2023 round | Batteries and pumped hydro | 166.9 |
| FY2024 round | Continuous operation of 3 hours or more and less than 6 hours | 96.1 |
| FY2024 round | Continuous operation of 6 hours or more | 76.9 |
| FY2025 round | Lithium-ion batteries and pumped hydro (excluding new build) | 81.9 |
| FY2025 round | Non-lithium-ion batteries, pumped hydro (new build) and LDES | 88.6 |
Monthly JEPX averages and 4-hour spreads by area, and capacity market area prices, laid out across issues. CSV downloads included.
You are welcome to quote the figures and charts on this page. Please give the source as follows.
Source: Science X Inc., “Battery Storage Market Notes, June 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-06
The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.
Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →
On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).
Register free to see prices and documents → Browse projects on Chikudensho Market