Battery Storage Market Notes, July 2026 issue

"Grid-scale battery storage" (a large battery connected to the transmission grid that stores electricity and releases it) earns money by selling the "capacity" to correct electricity surpluses and shortages. It also uses the price differences between times of day. These notes use published figures and our own records to show this month's moves in figures and tables. This issue is a back issue, produced retroactively in November 2026. The grid connection study totals are as of the time of production (October 19, 2026).

Science X Inc. · Published November 5, 2026 · A4, 14 pages

|

The 3 revenue sources of a battery storage plant (how to read these notes)

A battery storage plant (grid-scale battery) earns revenue from 3 markets. ① The balancing market (EPRX) is where the "capacity" to correct electricity surpluses and shortages is sold to grid operators. ② The wholesale electricity market (JEPX) is where you buy and store electricity at cheap times and sell it at expensive times. ③ The capacity market (OCCTO) is where the government buys future electricity supply capacity in advance. These notes present the figures in the order of these 3 markets. The ①②③ at the start of each section title shows which market it covers.

Figure 1  The 3 revenue sources of a battery storage plant
Figure 1 The 3 revenue sources of a battery storage plant

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).

Three trends this month

We picked 3 moves this month from the figures of the 3 markets.

① Balancing market (EPRX) | 7 products, and prices by area

The balancing market is where grid operators buy, every 30 minutes, the "capacity" to correct electricity surpluses and shortages. Products are divided by how fast they change output (Primary reserve responds to changes in frequency; Secondary and Tertiary reserves respond to dispatch instructions from the grid operator). Primary reserve is the fastest and Tertiary reserve 2 is the slowest. Primary reserve is a product that senses changes in frequency by itself and responds. It has 2 categories: "online", where the grid operator monitors operation over a dedicated line, and "offline", where no dedicated line is laid and a record of operation is submitted afterwards. These are offered and traded separately, so we show them separately. A Composite product is a bid that combines several products. Prices are set in yen per 1 kW of available capacity per 30 minutes. kW is a unit of the size of power that can be delivered, which is different from kWh, the amount of electricity. Each 30-minute trading round is called a "30-minute slot". The figure shows the range of winning prices by area (by the area where the power source is located). The thin line runs from the lowest to the highest winning bid in the month, the thick band is the price range that covers 8 of every 10 30-minute slots with winning bids, and the dot is the average winning price. Nationwide figures are in the table in the "Market figures" section.

By area, the highest average winning price in the balancing market was Primary reserve (offline) in Tohoku at 14.49 yen/kW per 30 min, and the lowest was Tertiary reserve 2 in Shikoku at 0.38 yen/kW per 30 min.

Figure 2  Range and average of winning prices by area in the balancing market (July 2026 (1st to 31st), by area where the power source is located)
Figure 2 Range and average of winning prices by area in the balancing market (July 2026 (1st to 31st), by area where the power source is located)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

ProductResponse timeDuration
Primary reserve (online)Within 10 seconds5 minutes or more
Primary reserve (offline)Within 30 secondsNo set duration
Secondary reserve 1Within 5 minutes30 minutes
Secondary reserve 2Within 5 minutes30 minutes
Tertiary reserve 1Within 15 minutes30 minutes
Tertiary reserve 2Within 60 minutes30 minutes
Composite productRequirements of the combined productsRequirements of the combined products

① Balancing market (EPRX) | Grid areas and times where bids win more easily

The win rate is the share of the bid volume that wins. The higher it is, the more easily bids win. The figure plots the win rate for each product by time of day (every 30 minutes), for each grid area (area where the power source is located). Where a line is broken, there were no bids at that time.

Figure 3  Win rate in the balancing market (grid area (area where the power source is located) × time of day, July 2026 (1st to 31st))
Figure 3 Win rate in the balancing market (grid area (area where the power source is located) × time of day, July 2026 (1st to 31st))

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

① Balancing market (EPRX) | Primary reserve (online) became a competition for slots

Primary reserve is the fastest product. It responds to changes in frequency and changes output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left side is the online category and the right side is the offline category. The bars show the bid-to-cover ratio (bid volume ÷ volume procured by grid operators). Above 100% means more bids came in than the volume procured. Even below 100%, some bids do not win (see the win rate in the "Market figures" table). The bars rise both when bids increase and when the procured volume falls. The line shows the average winning price. These are monthly figures from April 2025, the data we have.

In the balancing market, the bid-to-cover ratio of Primary reserve (online) went above 100%, at 106.8% in June 2026 and 119.7% this month. Its average winning price was 2.89 yen/kW per 30 min in April 2025 and 4.35 yen/kW per 30 min this month. Primary reserve (offline) had a bid-to-cover ratio of 65.1% and an average winning price of 10.25 yen/kW per 30 min this month. From April 2025 to this month, the procured volume fell from 3,066.1 MW to 1,408.5 MW for online and from 1,122.5 MW to 495.7 MW for offline.

Figure 4  Bid-to-cover ratio (bars) and average winning price (line) of Primary reserve (monthly; online on the left, offline on the right; gold bars are months when bids exceeded the procured volume)
Figure 4 Bid-to-cover ratio (bars) and average winning price (line) of Primary reserve (monthly; online on the left, offline on the right; gold bars are months when bids exceeded the procured volume)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

① Balancing market (EPRX) | How prices by product have moved

These are the average winning prices by product from April 2025 (monthly averages weighted by winning volume). From March 14, 2026, Primary to Tertiary reserve 1 and the Composite product moved from trading in 3-hour blocks to trading every 30 minutes (Tertiary reserve 2 was already traded every 30 minutes).

In the balancing market, the average winning price of Tertiary reserve 2 was 1.12 yen/kW per 30 min in April 2025 and 1.88 yen/kW per 30 min this month, with a high of 4.18 yen/kW per 30 min in May 2026. Primary reserve (offline) was 15.10 yen/kW per 30 min in April 2025 and 10.25 yen/kW per 30 min this month, with a high of 18.37 yen/kW per 30 min in July 2025.

Figure 5  Average winning price by product in the balancing market (yen/kW per 30 min, monthly)
Figure 5 Average winning price by product in the balancing market (yen/kW per 30 min, monthly)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

① Balancing market (EPRX) | Which times of day are expensive

These are the hourly average winning prices by product for July 2026 (1st to 31st).

In the balancing market, the average winning price of Primary reserve (online) was highest around 18:00 at 6.07 yen/kW per 30 min and lowest around 3:00 at 3.44 yen/kW per 30 min. Tertiary reserve 2 was highest around 20:00 at 17.85 yen/kW per 30 min and lowest around 2:00 at 0.37 yen/kW per 30 min.

Figure 6  Average winning price by time of day in the balancing market (July 2026 (1st to 31st), yen/kW per 30 min)
Figure 6 Average winning price by time of day in the balancing market (July 2026 (1st to 31st), yen/kW per 30 min)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

① Balancing market (EPRX) | Which products batteries are used for

The figure shows the share of winning volume held by batteries. The table compares the average winning price of the volume won by batteries with the average winning price of the product as a whole.

In the balancing market, batteries held 22.8% of Primary reserve (online), and the average winning price of the volume won by batteries was 8.50 yen/kW per 30 min (overall 4.35 yen/kW per 30 min). Batteries held 100.0% of Primary reserve (offline), and both the battery volume and the overall price were 10.25 yen/kW per 30 min.

Figure 7  Share of batteries in the balancing market (%)
Figure 7 Share of batteries in the balancing market (%)

Source: Trading results (preliminary) by power source type, published by the Electric Power Reserve Exchange (EPRX). Our compilation.

ProductVolume won by batteries (yen/kW per 30 min)Product overall (yen/kW per 30 min)
Primary reserve (online)8.504.35
Primary reserve (offline)10.2510.25
Secondary reserve 15.522.65
Secondary reserve 24.472.39
Tertiary reserve 14.432.25
Tertiary reserve 251.971.88
Composite product8.482.91

Both are averages weighted by winning volume (July 2026, preliminary, nationwide). The battery share of Tertiary reserve 2 is only 0.3% of winning volume. The nationwide average winning price of the 30-minute slots where batteries won, weighted by battery winning volume, is 7.02 yen. The battery average is high not because batteries are concentrated in high-priced slots, but because the battery bids themselves are priced high (each winning bid is settled at its own bid price).

① Balancing market (EPRX) | Sales are concentrated in a small number of slots

We ranked the month's 30-minute slots with winning bids by sales (average winning price × winning volume, nationwide), from highest to lowest, and plotted for each product what % of the month's sales the top slots account for. The more a curve bulges above the dotted line, the more sales are concentrated in fewer slots. Tertiary reserve 2 is a product that covers forecast errors in weather-dependent renewable generation. Its price is low in most slots and high in only a few.

In the balancing market, the top 10% of slots accounted for 57.3% of July 2026 sales for Tertiary reserve 2 and 17.7% for Primary reserve (online). The top 1% of slots accounted for 11.4% for Tertiary reserve 2 and 2.2% for Primary reserve (online).

Figure 8  Share of balancing market sales concentrated in the top slots (July 2026 (1st to 31st), nationwide)
Figure 8 Share of balancing market sales concentrated in the top slots (July 2026 (1st to 31st), nationwide)

Source: Trading results (preliminary) published by the Electric Power Reserve Exchange (EPRX). Our compilation.

In July 2026, out of 1,188 30-minute slots with winning bids, the top 1% by sales (average winning price × winning volume) accounted for 11.4% of the month's sales. There were 39 slots with a nationwide average winning price of 10 yen/kW per 30 min or more, and 300 slots with no winning bids.

Slots with the highest maximum winning prices (by area where the power source is located). The maximum winning price is the price of the single highest winning bid. The average winning price for the same slot and area is shown on the right:

DateTimeAreaMaximum winning price (yen/kW per 30 min)Average winning price for the same slot and area (yen/kW per 30 min)
July 119:00Tokyo97.0016.43
July 119:30Tokyo97.0016.28
July 1110:00Tokyo97.0016.51
July 1110:30Tokyo97.0010.00
July 159:00Tokyo97.0016.09

② Wholesale electricity (JEPX) | Average prices

Wholesale electricity is electricity bought and sold between power companies and retailers. Its price is set on the "spot market" of the Japan Electric Power Exchange (JEPX) (a market where electricity for the next day is traded the day before). "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When the transmission lines between regions become congested, prices split by area from Hokkaido to Kyushu (area prices).

The monthly average of the System (nationwide) price on the wholesale market (JEPX) in July 2026 was 17.91 yen/kWh, compared with 12.75 yen/kWh in the same month last year.

Figure 9  Average wholesale electricity price (yen/kWh). Navy is July 2026, grey is the same month last year
Figure 9 Average wholesale electricity price (yen/kWh). Navy is July 2026, grey is the same month last year

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our compilation.

② Wholesale electricity (JEPX) | How the price moves through the day

The wholesale electricity price changes every 30 minutes. The figure shows the daily shape, averaging the price at the same time of day across the month. If a battery charges at cheap times and discharges at expensive times, the difference becomes its revenue.

The daily low and peak of the wholesale price were 15.28 yen/kWh around 6:00 and 28.07 yen/kWh around 18:30 in Tokyo, and 9.85 yen/kWh around 12:30 and 27.02 yen/kWh around 18:30 in Kyushu.

Figure 10  Daily peaks and lows of the wholesale electricity price (July 2026 average, yen/kWh)
Figure 10 Daily peaks and lows of the wholesale electricity price (July 2026 average, yen/kWh)

Source: JEPX spot market. Our compilation.

② Wholesale electricity (JEPX) | How much is the spread per kWh

For each area, we took the average price of the day's highest 4 hours minus the average price of the day's lowest 4 hours, and show the monthly average. This equals the difference per kWh if you buy 1 kWh in the cheapest 4 hours and sell it in the most expensive 4 hours. It is a simple difference: it does not deduct electricity lost in charging and discharging or fees, and it ignores the order of the cheap and expensive hours.

The monthly average spread between the highest 4 hours and the lowest 4 hours of the wholesale price was largest in Shikoku at 16.78 yen/kWh and smallest in Tokyo at 13.17 yen/kWh.

Figure 11  Wholesale electricity spread: average of the highest 4 hours − average of the lowest 4 hours (July 2026, yen/kWh, monthly average)
Figure 11 Wholesale electricity spread: average of the highest 4 hours − average of the lowest 4 hours (July 2026, yen/kWh, monthly average)

Source: JEPX spot market. Our compilation.

Area2-hour spread (yen/kWh)4-hour spread (yen/kWh)Days with a 4-hour spread of 10 yen or more
System (nationwide)14.7913.5121
Hokkaido17.9215.8625
Tohoku17.2415.2026
Tokyo15.1513.1722
Chubu14.9813.7023
Hokuriku14.9813.6521
Kansai15.2013.7721
Chugoku16.0914.5521
Shikoku18.9716.7823
Kyushu17.0415.7122

The spread is the monthly average of the daily differences. July 2026 covers 31 days.

② Wholesale electricity (JEPX) | There is a spread every day

We show the same 4-hour spread day by day. The larger the spread on a day, the more room a battery has to earn from it.

Out of 31 days, the 4-hour wholesale spread was 10 yen or more on 21 days for System (nationwide), and on 26 days in Tohoku, the area with the most.

Figure 12  Daily wholesale electricity spread (average of the day's highest 4 hours − average of the lowest 4 hours, yen/kWh)
Figure 12 Daily wholesale electricity spread (average of the day's highest 4 hours − average of the lowest 4 hours, yen/kWh)

Source: JEPX spot market. Our compilation.

③ Capacity market (OCCTO) | A market that buys future supply capacity

The capacity market buys electricity supply capacity 4 years ahead through an annual auction. Prices are set in yen per kW per year. The left figure shows the clearing prices of past main auctions. The right figure shows the battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (a separate auction that promises capacity revenue, in principle for 20 years, for new decarbonized power sources and similar). These are published once a year, so they do not change every month. The latest is delivery fiscal year FY2029 (published January 2026).

The capacity market clearing price for Tokyo was 14,137 yen/kW for delivery FY2024 and 3,495 yen/kW for FY2025. The latest publication, which comes once a year and does not change monthly, is 15,111 yen/kW for FY2029. In the latest publication of the Long-Term Decarbonization Power Source Auction (FY2025 round), also once a year, the awarded battery and pumped hydro capacity was 819 MW for lithium-ion batteries and pumped hydro (excluding new build), and 886 MW for non-lithium-ion batteries, pumped hydro (new build) and LDES.

Figure 13  Capacity market clearing prices (left, yen/kW) and battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)
Figure 13 Capacity market clearing prices (left, yen/kW) and battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)

Source: Clearing results and capacity contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources listed in the last section (Assumptions and terms)). As published.

Our records | Where battery storage projects are increasing

We counted, by grid area of the grid operator, the projects newly listed this month on Chikudensho Market (our marketplace for battery storage sites), a site where we list battery storage projects for buyers. These are figures for projects we handled, not counts for the whole market. Transfer of rights is a sale that hands over the land and grid rights. Completed-build handover is a sale that hands over the finished facility.

New listings on Chikudensho Market (our marketplace for battery storage sites) in July 2026 were 27 projects, 137.3 MW. By grid area, these included Tokyo with 12 projects, 23.9 MW, Chugoku with 4 projects, 91.4 MW, and Kyushu with 5 projects, 10.0 MW.

Figure 14  Capacity of projects we listed on Chikudensho Market (our marketplace for battery storage sites) in July 2026 (MW)
Figure 14 Capacity of projects we listed on Chikudensho Market (our marketplace for battery storage sites) in July 2026 (MW)

Source: Records of Chikudensho Market (project locations are shown only to the grid area level; prices and parties are not listed).

Our records | How many months and how much it costs to connect to the grid

A grid connection study is a procedure in which you ask the grid operator to check "can we connect at this site, and how much will the work cost". The grid connection cost contribution is the part of the connection work cost that the applicant pays. From the response documents we received, we compiled only the high-voltage ones (connecting to 6,600 V distribution lines) by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.

The medians of grid connection studies (high voltage only, as of October 19, 2026) range from 8.0 months (Tokyo) to 17.0 months (Tohoku) for the construction period, and from ¥3.02 million (Tokyo) to ¥32.35 million (Tohoku) for the grid connection cost contribution.

Figure 15  Median of grid connection study responses (high voltage) by grid area (left: months of construction work; right: grid connection cost contribution, excluding tax)
Figure 15 Median of grid connection study responses (high voltage) by grid area (left: months of construction work; right: grid connection cost contribution, excluding tax)

Source: Our compilation of the high-voltage grid connection study response documents we received from general transmission and distribution operators (as of October 19, 2026).

Market figures (tables ready to use in your materials)

We put the figures behind the charts into tables so you can use them in your materials: ① nationwide figures by product for the balancing market (bid-to-cover ratio, win rate, price, battery share), ② figures by area and trading volume for the wholesale market (JEPX), and ③ capacity market clearing prices.

Balancing market (July 2026, preliminary, nationwide)

ProductProcured volume (MW)Bid volume (MW)Winning volume (MW)Bid-to-cover ratio (bids ÷ procured)Win rate (winning ÷ bids)Average winning price (yen/kW per 30 min)Battery share
Primary reserve (online)1,408.51,685.71,334.8119.7%79.2%4.3522.8%
Primary reserve (offline)495.7322.7207.765.1%64.4%10.25100.0%
Secondary reserve 1924.01,972.71,190.9213.5%60.4%2.651.3%
Secondary reserve 2831.03,496.62,139.8420.8%61.2%2.390.6%
Tertiary reserve 12,455.65,280.72,922.3215.0%55.3%2.250.5%
Tertiary reserve 2333.01,561.8329.6469.0%21.1%1.880.3%
Composite product3,290.15,975.83,459.0181.6%57.9%2.918.8%

Volumes are averages per 30-minute slot. Products with a bid-to-cover ratio below 100% did not receive enough bids for the volume procured. The win rate is the share of the bid volume that won.

Wholesale electricity, JEPX spot market (July 2026, by area, yen/kWh)

AreaMonthly averageSame month last yearDaytime (8:00–16:00)Evening (16:00–20:00)4-hour spreadMaximumSlots at 30 yen or moreSlots at 0.01 yen
System (nationwide)17.9112.7515.9726.0213.5146.881370
Hokkaido14.3213.1110.5722.5815.8645.01676
Tohoku17.9813.0015.0625.9615.2050.011023
Tokyo19.8613.8819.7526.7013.1750.011500
Chubu18.8413.8317.6126.3813.7046.401600
Hokuriku17.2613.3716.6724.7813.6546.401510
Kansai17.1913.3716.4824.8913.7758.381470
Chugoku16.1811.7113.5524.7114.5558.381230
Shikoku13.639.609.8920.6416.7858.3810023
Kyushu15.3711.3811.6024.6815.7158.381230

Trading volume (July 2026, total of 31 days): total contracted volume 37,697 million kWh (same month last year 27,205 million kWh), sell bids 55,527 million kWh, buy bids 46,604 million kWh.

Capacity market main auction area prices (yen/kW per year)

Delivery fiscal yearHokkaidoTohokuTokyoChubuHokurikuKansaiChugokuShikokuKyushu
FY202414,13714,13714,13714,13714,13714,13714,13714,13714,137
FY20255,2423,4953,4953,4953,4953,4953,4953,4955,242
FY20268,7495,8335,8345,8325,8325,8325,8325,8328,748
FY202713,2879,0449,5557,8237,6387,6387,6387,63811,457
FY202814,81214,81214,81210,2808,7858,7858,7858,78513,177
FY202914,97215,11115,11112,38812,38812,38812,38812,38815,112

Battery and pumped hydro capacity awarded in the Long-Term Decarbonization Power Source Auction (10,000 kW)

Auction roundCategoryAwarded capacity (10,000 kW)
FY2023 roundBatteries and pumped hydro166.9
FY2024 roundContinuous operation of 3 hours to under 6 hours96.1
FY2024 roundContinuous operation of 6 hours or more76.9
FY2025 roundLithium-ion batteries and pumped hydro (excluding new build)81.9
FY2025 roundNon-lithium-ion batteries, pumped hydro (new build) and LDES88.6

Assumptions and terms

How to read the numbers in this issue

Figures across issues

How to cite

You are welcome to quote the figures and charts on this page. Please give the source as follows.

Source: Science X Inc., “Battery Storage Market Notes, July 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-07

Page: https://www.scix.co.jp/en/research/2026-07 · Updated:

The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.

Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →

Want to see the projects behind these numbers? Visit Chikudensho Market

On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).

Register free to see prices and documents → Browse projects on Chikudensho Market