"Grid-scale battery storage" (large batteries connected to the power grid that store electricity and release it) earns money by selling the "power" to fix electricity surpluses and shortages. It also earns from the way electricity prices change by time of day. These notes use published figures and our own records to show this month's movements in figures and tables.
Science X Inc. · Published November 1, 2026 · A4, 15 pages
A battery storage site (grid-scale battery storage) earns income from three markets. ① The balancing market (EPRX) is where the "power" to fix electricity surpluses and shortages is sold to grid operators. ② Wholesale electricity (JEPX) is where electricity is bought and stored in cheap hours and sold in expensive hours. ③ The capacity market (OCCTO) is where the government buys future electricity supply capacity in advance. These notes set out the numbers in the order of these three markets. The ①②③ at the start of a section title shows which market it covers.

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).
From the numbers in the three markets, we picked three movements this month.
The balancing market is where grid operators buy the "power" to fix electricity surpluses and shortages every 30 minutes. Products are split by how fast output must change (Primary reserve acts on changes in frequency; Secondary and Tertiary reserve act on instructions from the grid operator). Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve is a product that senses frequency changes by itself and acts. It has two categories: "online", where the grid operator monitors operation over a dedicated line, and "offline", where no dedicated line is installed and a record of operation is submitted afterwards. They are procured and traded separately, so we show them separately. A Composite product is a bid that bundles several products. Prices are set in yen per 1 kW of available power per 30 minutes. kW is a unit of how much power can be delivered, and is different from kWh, which measures an amount of electricity. One 30-minute trading round is called a "30-minute slot". The figure shows the range of winning prices by area (by the area where the resource is located). The thin line runs from the cheapest to the most expensive winning bid in the month, the thick band is the price range that holds 8 out of 10 slots with awards, and the dot is the average winning price. Nationwide numbers are in the tables in the "Market numbers" section. Published values for October 2026 are not yet in our totals, so we show the latest month with all products available: September 2026 (1st–29th) (preliminary values).
In the balancing market in September 2026, by area where the resource is located, the highest average winning price was 9.51 yen/kW per 30 min for Primary reserve (offline) in Tohoku, and the lowest was 0.38 yen/kW per 30 min for Tertiary reserve 2 in Shikoku.

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
| Product | Response time | Duration |
|---|---|---|
| Primary reserve (online) | Within 10 seconds | 5 minutes or more |
| Primary reserve (offline) | Within 30 seconds | No set duration |
| Secondary reserve 1 | Within 5 minutes | 30 minutes |
| Secondary reserve 2 | Within 5 minutes | 30 minutes |
| Tertiary reserve 1 | Within 15 minutes | 30 minutes |
| Tertiary reserve 2 | Within 60 minutes | 30 minutes |
| Composite product | Requirements of the combined products | Requirements of the combined products |
The award rate is the share of bid volume that was awarded. The higher it is, the more likely bids are to win. The figure shows the award rate for each product by time of day (every 30 minutes), for each grid area (the area where the resource is located). Where a line breaks, there were no bids at that time.

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
Primary reserve is the fastest product. It responds to changes in frequency and changes output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left side is the online category and the right side is the offline category. The bars show the bid ratio (bid volume ÷ volume procured by grid operators). Above 100% means more bids came in than were procured. Even below 100%, some bids are not awarded (the award rate is in the "Market numbers" table). The bars rise when bids increase and also when procurement falls. The line is the average winning price. These are the monthly figures we have, from April 2025.
In the balancing market, the bid ratio for Primary reserve (online) went above 100% in June 2026, at 106.8%, and was 123.1% in September 2026. The average winning price went from 2.89 yen/kW per 30 min in April 2025 to 3.43 yen/kW per 30 min in September 2026, and the procured volume went from 3,066.1MW in April 2025 to 1,388.7MW in September 2026. For Primary reserve (offline), in September 2026 the bid ratio was 84.0% and the average winning price was 5.79 yen/kW per 30 min, and the procured volume went from 1,122.5MW in April 2025 to 497.8MW in September 2026.

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
These are the average winning prices by product since April 2025 (monthly averages weighted by awarded volume). From March 14, 2026, Primary to Tertiary reserve 1 and the Composite product moved from 3-hour trading to 30-minute trading (Tertiary reserve 2 was already 30 minutes).
In the balancing market, from April 2025 to September 2026, average winning prices (yen/kW per 30 min) went from 2.89 yen to 3.43 yen for Primary reserve (online), from 15.10 yen to 5.79 yen for Primary reserve (offline), and from 1.12 yen to 2.22 yen for Tertiary reserve 2. The highest months were February 2026 at 4.90 yen for Primary reserve (online), July 2025 at 18.37 yen for Primary reserve (offline), and May 2026 at 4.18 yen for Tertiary reserve 2.

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
These are the hourly average winning prices by product for September 2026 (1st–29th).
In the balancing market in September 2026, average winning prices by hour were highest at 4.09 yen in the 18:00 hour and lowest at 2.75 yen in the 0:00 hour for Primary reserve (online), and highest at 5.02 yen in the 19:00 hour and lowest at 0.47 yen in the 0:00 hour for Tertiary reserve 2 (yen/kW per 30 min).

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
The figure shows the share of awarded volume held by batteries. The table compares the average winning price of the volume awarded to batteries with the average winning price of the whole product.
In the balancing market in September 2026, the battery share was 27.9% for Primary reserve (online) and 100.0% for Primary reserve (offline). The average winning price of the volume awarded to batteries was 5.17 yen/kW per 30 min for Primary reserve (online) (3.43 yen/kW per 30 min overall), and 59.26 yen/kW per 30 min for Tertiary reserve 2 (2.22 yen/kW per 30 min overall).

Source: Trading results by resource type (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
| Product | Awarded to batteries (yen/kW per 30 min) | Whole product (yen/kW per 30 min) |
|---|---|---|
| Primary reserve (online) | 5.17 | 3.43 |
| Primary reserve (offline) | 5.79 | 5.79 |
| Secondary reserve 1 | 2.18 | 2.49 |
| Secondary reserve 2 | 1.85 | 2.51 |
| Tertiary reserve 1 | 1.86 | 2.28 |
| Tertiary reserve 2 | 59.26 | 2.22 |
| Composite product | 5.13 | 2.64 |
Both are averages weighted by awarded volume (September 2026, preliminary values, nationwide). In Tertiary reserve 2, batteries make up only 0.8% of awarded volume. The nationwide average winning price in the slots where batteries won, weighted by battery awarded volume, is 5.82 yen. The battery average is high not because batteries are concentrated in expensive slots, but because the battery bids themselves are priced high (each winning bid is settled at its own bid price).
We ranked the month's 30-minute slots with awards by revenue (average winning price × awarded volume, nationwide), from highest to lowest, and plotted for each product what share of the month's revenue the top slots hold. The more a curve bulges above the dotted line, the more revenue is concentrated in a few slots. Tertiary reserve 2 is a product that covers errors in forecasting renewable output caused by weather. Its price is low in most slots and high in only a few.
In the balancing market in September 2026, the top 1% and top 10% of slots by revenue held 10.1% and 56.9% of the month's revenue for Tertiary reserve 2, and 2.1% and 15.8% for Primary reserve (online).

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.
In September 2026, out of 1,194 slots with awards, the top 1% of slots by revenue (average winning price × awarded volume) held 10.1% of the month's revenue. There were 25 slots with a nationwide average winning price of 10 yen/kW per 30 min or more, and 198 slots with no awards.
Slots with the highest top winning prices (by area where the resource is located). The highest winning price is the price of the single most expensive winning bid. The average winning price in the same slot and area is shown to the right:
| Day | Time | Area | Highest winning price (yen/kW per 30 min) | Average winning price in the same slot and area (yen/kW per 30 min) |
|---|---|---|---|---|
| September 8 | 9:30 | Tokyo | 96.50 | 6.01 |
| September 8 | 10:30 | Tokyo | 96.50 | 6.28 |
| September 8 | 11:00 | Tokyo | 96.50 | 6.56 |
| September 27 | 11:00 | Tokyo | 96.00 | 5.82 |
| September 27 | 11:30 | Tokyo | 96.00 | 5.18 |
Wholesale electricity is the electricity that power companies and retailers buy and sell. Its price is set in the "spot market" of the Japan Electric Power Exchange (JEPX) (the market where electricity for the next day is traded the day before). "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When transmission lines between regions get congested, prices split by area from Hokkaido to Kyushu (area prices).
The monthly average of the wholesale electricity (JEPX) System (nationwide) price was 22.51 yen/kWh in October 2026 and 11.67 yen/kWh in the same month last year, a difference of 10.84 yen.

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our totals.
Wholesale electricity prices change every 30 minutes. The figure shows the daily shape, averaging prices at the same time of day across the month. If a battery stores electricity in cheap hours and releases it in expensive hours, the difference becomes its income.
In October 2026, average wholesale electricity prices during the day ranged from a low of 19.03 yen around 12:00 to a high of 37.11 yen around 16:30 in Tokyo, and from 4.94 yen around 12:00 to 24.74 yen around 17:30 in Kyushu.

Source: JEPX spot market. Our totals.
We took the average price of the day's 4 most expensive hours minus the average price of the 4 cheapest hours, and show the monthly average by area. It equals the difference per kWh when you buy 1 kWh in the 4 cheapest hours and sell it in the 4 most expensive hours. It is a simple difference: electricity lost in charging and discharging and fees are not deducted, and the order of cheap and expensive hours is ignored.
In October 2026, the spread between the 4 most expensive and 4 cheapest hours of wholesale electricity (monthly average) was largest in Hokkaido at 29.02 yen/kWh and smallest in Tokyo at 17.14 yen/kWh.

Source: JEPX spot market. Our totals.
| Area | 2-hour spread (yen/kWh) | 4-hour spread (yen/kWh) | Days with a 4-hour spread of 10 yen or more |
|---|---|---|---|
| System (nationwide) | 22.95 | 20.42 | 29 |
| Hokkaido | 32.56 | 29.02 | 31 |
| Tohoku | 27.09 | 24.74 | 30 |
| Tokyo | 19.62 | 17.14 | 29 |
| Chubu | 22.37 | 19.91 | 29 |
| Hokuriku | 21.71 | 19.18 | 31 |
| Kansai | 21.22 | 18.71 | 31 |
| Chugoku | 20.90 | 18.93 | 31 |
| Shikoku | 19.40 | 17.27 | 28 |
| Kyushu | 21.19 | 19.30 | 31 |
The spread is the monthly average of the daily spreads. October 2026 covers 31 days.
We show the same 4-hour spread day by day. The bigger the spread on a day, the more room a battery has to earn from it.
Of the 31 days in October 2026, the wholesale electricity 4-hour spread was 10 yen or more on 29 days for System (nationwide), 31 days for Hokkaido, Hokuriku, Kansai, Chugoku and Kyushu, and 28 days for Shikoku.

Source: JEPX spot market. Our totals.
The capacity market buys electricity supply capacity four years ahead through an auction held once a year. Prices are set in yen per kW per year. The left figure shows clearing prices in past main auctions. The right figure shows the battery storage and pumped hydro capacity contracted in the Long-Term Decarbonization Power Source Auction (a separate auction that promises capacity income, in principle for 20 years, for things like building new decarbonized power sources). Results are published once a year, so they do not change every month. The latest is for delivery FY2029 (published January 2026).
In the capacity market main auction, the clearing price for Tokyo was 14,137 yen/kW for delivery FY2024, 3,495 yen/kW for FY2025, 5,834 yen/kW for FY2026, 9,555 yen/kW for FY2027, 14,812 yen/kW for FY2028 and 15,111 yen/kW for FY2029. In the Long-Term Decarbonization Power Source Auction, the contracted capacity of battery storage and pumped hydro was 1,669 MW in the FY2023 auction; in the FY2024 auction, 961 MW for a duration of 3 hours to under 6 hours and 769 MW for 6 hours or more; and in the FY2025 auction, 819 MW for lithium-ion battery storage and pumped hydro (excluding new builds) and 886 MW for non-lithium-ion battery storage, pumped hydro (new builds) and LDES. Both are annual values, so these are the latest published figures and do not change every month.

Source: Clearing results and capacity contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources listed in the last section (Assumptions and terms)). As published.
We counted the projects newly listed this month on Chikudensho Market (our marketplace for battery storage sites, where we list battery storage projects), by grid area of the grid operator. These are numbers for projects we handled, not counts for the whole market. Transfer of rights is a sale that hands over the land and grid rights. Completed-build handover is a sale that hands over the site once the equipment is built.
New listings on Chikudensho Market in October 2026 were 77 projects and 309.1 MW. By grid area, these included Tokyo with 33 projects and 99.8 MW, Tohoku with 8 projects and 73.4 MW, Chubu with 11 projects and 69.9 MW, and Kyushu with 13 projects and 19.9 MW.

Source: Chikudensho Market records (project locations are shown only down to the grid area; prices and parties are not shown).
A grid connection study is the process of asking the grid operator to check "can we connect at this site, and how much will the work cost". The grid connection cost contribution is the part of the connection work cost paid by the applicant. Of the response letters we have received, we totaled only the high-voltage ones (connecting to 6,600V distribution lines), by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.
The medians of grid connection study responses (high voltage only, as of October 19, 2026) ranged from 8.0 months in Tokyo to 17.0 months in Tohoku for construction time, and from ¥3.02 million in Tokyo to ¥32.35 million in Tohoku for the grid connection cost contribution (Tohoku: n=5 and n=8).

Source: Our totals of the high-voltage portion of grid connection study response letters we received from grid operators (as of October 19, 2026).
We put the numbers behind the figures into tables you can use in your own documents: ① nationwide numbers by product in the balancing market (bid ratio, award rate, price, battery share), ② wholesale electricity (JEPX) numbers by area and trading volume, and ③ capacity market clearing prices.
Balancing market (September 2026, preliminary values, nationwide)
| Product | Procured volume (MW) | Bid volume (MW) | Awarded volume (MW) | Bid ratio (bids ÷ procurement) | Award rate (awarded ÷ bids) | Average winning price (yen/kW per 30 min) | Battery share |
|---|---|---|---|---|---|---|---|
| Primary reserve (online) | 1,388.7 | 1,710.0 | 1,337.3 | 123.1% | 78.2% | 3.43 | 27.9% |
| Primary reserve (offline) | 497.8 | 418.4 | 265.7 | 84.0% | 63.5% | 5.79 | 100.0% |
| Secondary reserve 1 | 962.6 | 1,996.2 | 1,102.3 | 207.4% | 55.2% | 2.49 | 1.8% |
| Secondary reserve 2 | 983.1 | 3,709.3 | 2,163.2 | 377.3% | 58.3% | 2.51 | 1.0% |
| Tertiary reserve 1 | 2,498.5 | 5,895.9 | 3,021.0 | 236.0% | 51.2% | 2.28 | 0.7% |
| Tertiary reserve 2 | 376.3 | 1,371.7 | 368.9 | 364.5% | 26.9% | 2.22 | 0.8% |
| Composite product | 3,383.8 | 6,641.4 | 3,623.5 | 196.3% | 54.6% | 2.64 | 10.4% |
Volumes are averages per 30-minute slot. For products with a bid ratio below 100%, bids fall short of procurement. The award rate is the share of bid volume that was awarded.
Wholesale electricity, JEPX spot market (October 2026, by area, yen/kWh)
| Area | Monthly average | Same month last year | Daytime (8:00–16:00) | Evening (16:00–20:00) | 4-hour spread | Highest | Slots at 30 yen or more | Slots at 0.01 yen |
|---|---|---|---|---|---|---|---|---|
| System (nationwide) | 22.51 | 11.67 | 16.02 | 31.06 | 20.42 | 47.88 | 220 | 39 |
| Hokkaido | 20.49 | 12.89 | 11.31 | 32.25 | 29.02 | 105.00 | 303 | 67 |
| Tohoku | 23.99 | 12.08 | 15.78 | 34.19 | 24.74 | 50.01 | 437 | 95 |
| Tokyo | 27.02 | 13.06 | 23.12 | 34.69 | 17.14 | 50.01 | 466 | 16 |
| Chubu | 25.46 | 11.68 | 20.38 | 33.55 | 19.91 | 46.45 | 387 | 24 |
| Hokuriku | 19.70 | 11.27 | 18.29 | 26.92 | 19.18 | 46.45 | 218 | 24 |
| Kansai | 19.50 | 11.27 | 18.22 | 26.76 | 18.71 | 46.45 | 215 | 29 |
| Chugoku | 15.63 | 11.12 | 9.86 | 23.10 | 18.93 | 44.79 | 63 | 79 |
| Shikoku | 11.44 | 9.28 | 7.50 | 16.61 | 17.27 | 37.51 | 23 | 146 |
| Kyushu | 15.07 | 10.74 | 8.31 | 23.10 | 19.30 | 44.79 | 53 | 91 |
Trading volume (October 2026, total of 31 days): total contracted volume 30,319 million kWh (same month last year 22,279 million kWh), sell bids 45,218 million kWh, buy bids 38,191 million kWh.
Capacity market main auction area prices (yen/kW per year)
| Delivery fiscal year | Hokkaido | Tohoku | Tokyo | Chubu | Hokuriku | Kansai | Chugoku | Shikoku | Kyushu |
|---|---|---|---|---|---|---|---|---|---|
| FY2024 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 | 14,137 |
| FY2025 | 5,242 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 3,495 | 5,242 |
| FY2026 | 8,749 | 5,833 | 5,834 | 5,832 | 5,832 | 5,832 | 5,832 | 5,832 | 8,748 |
| FY2027 | 13,287 | 9,044 | 9,555 | 7,823 | 7,638 | 7,638 | 7,638 | 7,638 | 11,457 |
| FY2028 | 14,812 | 14,812 | 14,812 | 10,280 | 8,785 | 8,785 | 8,785 | 8,785 | 13,177 |
| FY2029 | 14,972 | 15,111 | 15,111 | 12,388 | 12,388 | 12,388 | 12,388 | 12,388 | 15,112 |
Contracted capacity of battery storage and pumped hydro in the Long-Term Decarbonization Power Source Auction (in units of 10,000 kW)
| Auction fiscal year | Category | Contracted capacity (10,000 kW) |
|---|---|---|
| FY2023 auction | Battery storage and pumped hydro | 166.9 |
| FY2024 auction | Duration of 3 hours to under 6 hours | 96.1 |
| FY2024 auction | Duration of 6 hours or more | 76.9 |
| FY2025 auction | Lithium-ion battery storage and pumped hydro (excluding new builds) | 81.9 |
| FY2025 auction | Non-lithium-ion battery storage, pumped hydro (new builds) and LDES | 88.6 |
Monthly JEPX averages and 4-hour spreads by area, and capacity market area prices, laid out across issues. CSV downloads included.
You are welcome to quote the figures and charts on this page. Please give the source as follows.
Source: Science X Inc., “Battery Storage Market Notes, October 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-10
The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.
Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →
On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).
Register free to see prices and documents → Browse projects on Chikudensho Market