Battery Storage Market Notes, October 2026 issue

"Grid-scale battery storage" (large batteries connected to the power grid that store electricity and release it) earns money by selling the "power" to fix electricity surpluses and shortages. It also earns from the way electricity prices change by time of day. These notes use published figures and our own records to show this month's movements in figures and tables.

Science X Inc. · Published November 1, 2026 · A4, 15 pages

|

Three income streams for a battery storage site (how to read these notes)

A battery storage site (grid-scale battery storage) earns income from three markets. ① The balancing market (EPRX) is where the "power" to fix electricity surpluses and shortages is sold to grid operators. ② Wholesale electricity (JEPX) is where electricity is bought and stored in cheap hours and sold in expensive hours. ③ The capacity market (OCCTO) is where the government buys future electricity supply capacity in advance. These notes set out the numbers in the order of these three markets. The ①②③ at the start of a section title shows which market it covers.

Figure 1  Three income streams for a battery storage site
Figure 1 Three income streams for a battery storage site

Source: Rules of the Japan Electric Power Exchange (JEPX), the Electric Power Reserve Exchange (EPRX) and the Organization for Cross-regional Coordination of Transmission Operators (OCCTO).

Three trends this month

From the numbers in the three markets, we picked three movements this month.

① Balancing market (EPRX) | 7 products and prices by area

The balancing market is where grid operators buy the "power" to fix electricity surpluses and shortages every 30 minutes. Products are split by how fast output must change (Primary reserve acts on changes in frequency; Secondary and Tertiary reserve act on instructions from the grid operator). Primary reserve is the fastest, and Tertiary reserve 2 is the slowest. Primary reserve is a product that senses frequency changes by itself and acts. It has two categories: "online", where the grid operator monitors operation over a dedicated line, and "offline", where no dedicated line is installed and a record of operation is submitted afterwards. They are procured and traded separately, so we show them separately. A Composite product is a bid that bundles several products. Prices are set in yen per 1 kW of available power per 30 minutes. kW is a unit of how much power can be delivered, and is different from kWh, which measures an amount of electricity. One 30-minute trading round is called a "30-minute slot". The figure shows the range of winning prices by area (by the area where the resource is located). The thin line runs from the cheapest to the most expensive winning bid in the month, the thick band is the price range that holds 8 out of 10 slots with awards, and the dot is the average winning price. Nationwide numbers are in the tables in the "Market numbers" section. Published values for October 2026 are not yet in our totals, so we show the latest month with all products available: September 2026 (1st–29th) (preliminary values).

In the balancing market in September 2026, by area where the resource is located, the highest average winning price was 9.51 yen/kW per 30 min for Primary reserve (offline) in Tohoku, and the lowest was 0.38 yen/kW per 30 min for Tertiary reserve 2 in Shikoku.

Figure 2  Range and average of winning prices by area in the balancing market (September 2026 (1st–29th), by area where the resource is located)
Figure 2 Range and average of winning prices by area in the balancing market (September 2026 (1st–29th), by area where the resource is located)

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

ProductResponse timeDuration
Primary reserve (online)Within 10 seconds5 minutes or more
Primary reserve (offline)Within 30 secondsNo set duration
Secondary reserve 1Within 5 minutes30 minutes
Secondary reserve 2Within 5 minutes30 minutes
Tertiary reserve 1Within 15 minutes30 minutes
Tertiary reserve 2Within 60 minutes30 minutes
Composite productRequirements of the combined productsRequirements of the combined products

① Balancing market (EPRX) | Grid areas and times where bids are likely to win

The award rate is the share of bid volume that was awarded. The higher it is, the more likely bids are to win. The figure shows the award rate for each product by time of day (every 30 minutes), for each grid area (the area where the resource is located). Where a line breaks, there were no bids at that time.

Figure 3  Award rate in the balancing market (grid area (area where the resource is located) × time of day, September 2026 (1st–29th))
Figure 3 Award rate in the balancing market (grid area (area where the resource is located) × time of day, September 2026 (1st–29th))

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | Primary reserve (online) turned into a competition for places

Primary reserve is the fastest product. It responds to changes in frequency and changes output within 10 seconds (online) or within 30 seconds (offline). Batteries are often used for it. The left side is the online category and the right side is the offline category. The bars show the bid ratio (bid volume ÷ volume procured by grid operators). Above 100% means more bids came in than were procured. Even below 100%, some bids are not awarded (the award rate is in the "Market numbers" table). The bars rise when bids increase and also when procurement falls. The line is the average winning price. These are the monthly figures we have, from April 2025.

In the balancing market, the bid ratio for Primary reserve (online) went above 100% in June 2026, at 106.8%, and was 123.1% in September 2026. The average winning price went from 2.89 yen/kW per 30 min in April 2025 to 3.43 yen/kW per 30 min in September 2026, and the procured volume went from 3,066.1MW in April 2025 to 1,388.7MW in September 2026. For Primary reserve (offline), in September 2026 the bid ratio was 84.0% and the average winning price was 5.79 yen/kW per 30 min, and the procured volume went from 1,122.5MW in April 2025 to 497.8MW in September 2026.

Figure 4  Bid ratio (bars) and average winning price (line) for Primary reserve (monthly; left is online, right is offline; gold bars are months when bids exceeded procurement)
Figure 4 Bid ratio (bars) and average winning price (line) for Primary reserve (monthly; left is online, right is offline; gold bars are months when bids exceeded procurement)

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | How prices have moved by product

These are the average winning prices by product since April 2025 (monthly averages weighted by awarded volume). From March 14, 2026, Primary to Tertiary reserve 1 and the Composite product moved from 3-hour trading to 30-minute trading (Tertiary reserve 2 was already 30 minutes).

In the balancing market, from April 2025 to September 2026, average winning prices (yen/kW per 30 min) went from 2.89 yen to 3.43 yen for Primary reserve (online), from 15.10 yen to 5.79 yen for Primary reserve (offline), and from 1.12 yen to 2.22 yen for Tertiary reserve 2. The highest months were February 2026 at 4.90 yen for Primary reserve (online), July 2025 at 18.37 yen for Primary reserve (offline), and May 2026 at 4.18 yen for Tertiary reserve 2.

Figure 5  Average winning price by product in the balancing market (yen/kW per 30 min, monthly)
Figure 5 Average winning price by product in the balancing market (yen/kW per 30 min, monthly)

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | Which hours of the day are expensive

These are the hourly average winning prices by product for September 2026 (1st–29th).

In the balancing market in September 2026, average winning prices by hour were highest at 4.09 yen in the 18:00 hour and lowest at 2.75 yen in the 0:00 hour for Primary reserve (online), and highest at 5.02 yen in the 19:00 hour and lowest at 0.47 yen in the 0:00 hour for Tertiary reserve 2 (yen/kW per 30 min).

Figure 6  Average winning price by hour in the balancing market (September 2026 (1st–29th), yen/kW per 30 min)
Figure 6 Average winning price by hour in the balancing market (September 2026 (1st–29th), yen/kW per 30 min)

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

① Balancing market (EPRX) | Which products batteries are used in

The figure shows the share of awarded volume held by batteries. The table compares the average winning price of the volume awarded to batteries with the average winning price of the whole product.

In the balancing market in September 2026, the battery share was 27.9% for Primary reserve (online) and 100.0% for Primary reserve (offline). The average winning price of the volume awarded to batteries was 5.17 yen/kW per 30 min for Primary reserve (online) (3.43 yen/kW per 30 min overall), and 59.26 yen/kW per 30 min for Tertiary reserve 2 (2.22 yen/kW per 30 min overall).

Figure 7  Share of batteries in the balancing market (%)
Figure 7 Share of batteries in the balancing market (%)

Source: Trading results by resource type (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

ProductAwarded to batteries (yen/kW per 30 min)Whole product (yen/kW per 30 min)
Primary reserve (online)5.173.43
Primary reserve (offline)5.795.79
Secondary reserve 12.182.49
Secondary reserve 21.852.51
Tertiary reserve 11.862.28
Tertiary reserve 259.262.22
Composite product5.132.64

Both are averages weighted by awarded volume (September 2026, preliminary values, nationwide). In Tertiary reserve 2, batteries make up only 0.8% of awarded volume. The nationwide average winning price in the slots where batteries won, weighted by battery awarded volume, is 5.82 yen. The battery average is high not because batteries are concentrated in expensive slots, but because the battery bids themselves are priced high (each winning bid is settled at its own bid price).

① Balancing market (EPRX) | Revenue gathers in a small number of slots

We ranked the month's 30-minute slots with awards by revenue (average winning price × awarded volume, nationwide), from highest to lowest, and plotted for each product what share of the month's revenue the top slots hold. The more a curve bulges above the dotted line, the more revenue is concentrated in a few slots. Tertiary reserve 2 is a product that covers errors in forecasting renewable output caused by weather. Its price is low in most slots and high in only a few.

In the balancing market in September 2026, the top 1% and top 10% of slots by revenue held 10.1% and 56.9% of the month's revenue for Tertiary reserve 2, and 2.1% and 15.8% for Primary reserve (online).

Figure 8  Share of revenue held by the top slots in the balancing market (September 2026 (1st–29th), nationwide)
Figure 8 Share of revenue held by the top slots in the balancing market (September 2026 (1st–29th), nationwide)

Source: Trading results (preliminary values) published by the Electric Power Reserve Exchange (EPRX). Our totals.

In September 2026, out of 1,194 slots with awards, the top 1% of slots by revenue (average winning price × awarded volume) held 10.1% of the month's revenue. There were 25 slots with a nationwide average winning price of 10 yen/kW per 30 min or more, and 198 slots with no awards.

Slots with the highest top winning prices (by area where the resource is located). The highest winning price is the price of the single most expensive winning bid. The average winning price in the same slot and area is shown to the right:

DayTimeAreaHighest winning price (yen/kW per 30 min)Average winning price in the same slot and area (yen/kW per 30 min)
September 89:30Tokyo96.506.01
September 810:30Tokyo96.506.28
September 811:00Tokyo96.506.56
September 2711:00Tokyo96.005.82
September 2711:30Tokyo96.005.18

② Wholesale electricity (JEPX) | Average prices

Wholesale electricity is the electricity that power companies and retailers buy and sell. Its price is set in the "spot market" of the Japan Electric Power Exchange (JEPX) (the market where electricity for the next day is traded the day before). "System (nationwide)" is the price when all of Japan is treated as one market (the system price). When transmission lines between regions get congested, prices split by area from Hokkaido to Kyushu (area prices).

The monthly average of the wholesale electricity (JEPX) System (nationwide) price was 22.51 yen/kWh in October 2026 and 11.67 yen/kWh in the same month last year, a difference of 10.84 yen.

Figure 9  Average wholesale electricity price (yen/kWh). Navy is October 2026, grey is the same month last year
Figure 9 Average wholesale electricity price (yen/kWh). Navy is October 2026, grey is the same month last year

Source: Spot market trading results published by the Japan Electric Power Exchange (JEPX). Simple average of 30-minute prices. Our totals.

② Wholesale electricity (JEPX) | How prices move during the day

Wholesale electricity prices change every 30 minutes. The figure shows the daily shape, averaging prices at the same time of day across the month. If a battery stores electricity in cheap hours and releases it in expensive hours, the difference becomes its income.

In October 2026, average wholesale electricity prices during the day ranged from a low of 19.03 yen around 12:00 to a high of 37.11 yen around 16:30 in Tokyo, and from 4.94 yen around 12:00 to 24.74 yen around 17:30 in Kyushu.

Figure 10  Daily peaks and troughs of wholesale electricity prices (October 2026 average, yen/kWh)
Figure 10 Daily peaks and troughs of wholesale electricity prices (October 2026 average, yen/kWh)

Source: JEPX spot market. Our totals.

② Wholesale electricity (JEPX) | How large the spread is per kWh

We took the average price of the day's 4 most expensive hours minus the average price of the 4 cheapest hours, and show the monthly average by area. It equals the difference per kWh when you buy 1 kWh in the 4 cheapest hours and sell it in the 4 most expensive hours. It is a simple difference: electricity lost in charging and discharging and fees are not deducted, and the order of cheap and expensive hours is ignored.

In October 2026, the spread between the 4 most expensive and 4 cheapest hours of wholesale electricity (monthly average) was largest in Hokkaido at 29.02 yen/kWh and smallest in Tokyo at 17.14 yen/kWh.

Figure 11  Wholesale electricity spread: average of the 4 most expensive hours − average of the 4 cheapest hours (October 2026, yen/kWh, monthly average)
Figure 11 Wholesale electricity spread: average of the 4 most expensive hours − average of the 4 cheapest hours (October 2026, yen/kWh, monthly average)

Source: JEPX spot market. Our totals.

Area2-hour spread (yen/kWh)4-hour spread (yen/kWh)Days with a 4-hour spread of 10 yen or more
System (nationwide)22.9520.4229
Hokkaido32.5629.0231
Tohoku27.0924.7430
Tokyo19.6217.1429
Chubu22.3719.9129
Hokuriku21.7119.1831
Kansai21.2218.7131
Chugoku20.9018.9331
Shikoku19.4017.2728
Kyushu21.1919.3031

The spread is the monthly average of the daily spreads. October 2026 covers 31 days.

② Wholesale electricity (JEPX) | There is a spread every day

We show the same 4-hour spread day by day. The bigger the spread on a day, the more room a battery has to earn from it.

Of the 31 days in October 2026, the wholesale electricity 4-hour spread was 10 yen or more on 29 days for System (nationwide), 31 days for Hokkaido, Hokuriku, Kansai, Chugoku and Kyushu, and 28 days for Shikoku.

Figure 12  Daily wholesale electricity spread (the day's average of the 4 most expensive hours − average of the 4 cheapest hours, yen/kWh)
Figure 12 Daily wholesale electricity spread (the day's average of the 4 most expensive hours − average of the 4 cheapest hours, yen/kWh)

Source: JEPX spot market. Our totals.

③ Capacity market (OCCTO) | A market that buys future supply capacity

The capacity market buys electricity supply capacity four years ahead through an auction held once a year. Prices are set in yen per kW per year. The left figure shows clearing prices in past main auctions. The right figure shows the battery storage and pumped hydro capacity contracted in the Long-Term Decarbonization Power Source Auction (a separate auction that promises capacity income, in principle for 20 years, for things like building new decarbonized power sources). Results are published once a year, so they do not change every month. The latest is for delivery FY2029 (published January 2026).

In the capacity market main auction, the clearing price for Tokyo was 14,137 yen/kW for delivery FY2024, 3,495 yen/kW for FY2025, 5,834 yen/kW for FY2026, 9,555 yen/kW for FY2027, 14,812 yen/kW for FY2028 and 15,111 yen/kW for FY2029. In the Long-Term Decarbonization Power Source Auction, the contracted capacity of battery storage and pumped hydro was 1,669 MW in the FY2023 auction; in the FY2024 auction, 961 MW for a duration of 3 hours to under 6 hours and 769 MW for 6 hours or more; and in the FY2025 auction, 819 MW for lithium-ion battery storage and pumped hydro (excluding new builds) and 886 MW for non-lithium-ion battery storage, pumped hydro (new builds) and LDES. Both are annual values, so these are the latest published figures and do not change every month.

Figure 13  Capacity market clearing prices (left, yen/kW) and contracted capacity of battery storage and pumped hydro in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)
Figure 13 Capacity market clearing prices (left, yen/kW) and contracted capacity of battery storage and pumped hydro in the Long-Term Decarbonization Power Source Auction (right, in units of 10,000 kW)

Source: Clearing results and capacity contract documents published by the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) (sources listed in the last section (Assumptions and terms)). As published.

Our records | Where battery storage projects are increasing

We counted the projects newly listed this month on Chikudensho Market (our marketplace for battery storage sites, where we list battery storage projects), by grid area of the grid operator. These are numbers for projects we handled, not counts for the whole market. Transfer of rights is a sale that hands over the land and grid rights. Completed-build handover is a sale that hands over the site once the equipment is built.

New listings on Chikudensho Market in October 2026 were 77 projects and 309.1 MW. By grid area, these included Tokyo with 33 projects and 99.8 MW, Tohoku with 8 projects and 73.4 MW, Chubu with 11 projects and 69.9 MW, and Kyushu with 13 projects and 19.9 MW.

Figure 14  Output (MW) of projects we listed on Chikudensho Market in October 2026
Figure 14 Output (MW) of projects we listed on Chikudensho Market in October 2026

Source: Chikudensho Market records (project locations are shown only down to the grid area; prices and parties are not shown).

Our records | How many months and how much it costs to connect to the grid

A grid connection study is the process of asking the grid operator to check "can we connect at this site, and how much will the work cost". The grid connection cost contribution is the part of the connection work cost paid by the applicant. Of the response letters we have received, we totaled only the high-voltage ones (connecting to 6,600V distribution lines), by grid area. Extra-high voltage is not included. Grid areas with fewer than 5 cases are not shown.

The medians of grid connection study responses (high voltage only, as of October 19, 2026) ranged from 8.0 months in Tokyo to 17.0 months in Tohoku for construction time, and from ¥3.02 million in Tokyo to ¥32.35 million in Tohoku for the grid connection cost contribution (Tohoku: n=5 and n=8).

Figure 15  Medians of grid connection study responses (high voltage) by grid area (left: months of construction work, right: grid connection cost contribution, excluding tax)
Figure 15 Medians of grid connection study responses (high voltage) by grid area (left: months of construction work, right: grid connection cost contribution, excluding tax)

Source: Our totals of the high-voltage portion of grid connection study response letters we received from grid operators (as of October 19, 2026).

Market numbers (tables you can use as they are)

We put the numbers behind the figures into tables you can use in your own documents: ① nationwide numbers by product in the balancing market (bid ratio, award rate, price, battery share), ② wholesale electricity (JEPX) numbers by area and trading volume, and ③ capacity market clearing prices.

Balancing market (September 2026, preliminary values, nationwide)

ProductProcured volume (MW)Bid volume (MW)Awarded volume (MW)Bid ratio (bids ÷ procurement)Award rate (awarded ÷ bids)Average winning price (yen/kW per 30 min)Battery share
Primary reserve (online)1,388.71,710.01,337.3123.1%78.2%3.4327.9%
Primary reserve (offline)497.8418.4265.784.0%63.5%5.79100.0%
Secondary reserve 1962.61,996.21,102.3207.4%55.2%2.491.8%
Secondary reserve 2983.13,709.32,163.2377.3%58.3%2.511.0%
Tertiary reserve 12,498.55,895.93,021.0236.0%51.2%2.280.7%
Tertiary reserve 2376.31,371.7368.9364.5%26.9%2.220.8%
Composite product3,383.86,641.43,623.5196.3%54.6%2.6410.4%

Volumes are averages per 30-minute slot. For products with a bid ratio below 100%, bids fall short of procurement. The award rate is the share of bid volume that was awarded.

Wholesale electricity, JEPX spot market (October 2026, by area, yen/kWh)

AreaMonthly averageSame month last yearDaytime (8:00–16:00)Evening (16:00–20:00)4-hour spreadHighestSlots at 30 yen or moreSlots at 0.01 yen
System (nationwide)22.5111.6716.0231.0620.4247.8822039
Hokkaido20.4912.8911.3132.2529.02105.0030367
Tohoku23.9912.0815.7834.1924.7450.0143795
Tokyo27.0213.0623.1234.6917.1450.0146616
Chubu25.4611.6820.3833.5519.9146.4538724
Hokuriku19.7011.2718.2926.9219.1846.4521824
Kansai19.5011.2718.2226.7618.7146.4521529
Chugoku15.6311.129.8623.1018.9344.796379
Shikoku11.449.287.5016.6117.2737.5123146
Kyushu15.0710.748.3123.1019.3044.795391

Trading volume (October 2026, total of 31 days): total contracted volume 30,319 million kWh (same month last year 22,279 million kWh), sell bids 45,218 million kWh, buy bids 38,191 million kWh.

Capacity market main auction area prices (yen/kW per year)

Delivery fiscal yearHokkaidoTohokuTokyoChubuHokurikuKansaiChugokuShikokuKyushu
FY202414,13714,13714,13714,13714,13714,13714,13714,13714,137
FY20255,2423,4953,4953,4953,4953,4953,4953,4955,242
FY20268,7495,8335,8345,8325,8325,8325,8325,8328,748
FY202713,2879,0449,5557,8237,6387,6387,6387,63811,457
FY202814,81214,81214,81210,2808,7858,7858,7858,78513,177
FY202914,97215,11115,11112,38812,38812,38812,38812,38815,112

Contracted capacity of battery storage and pumped hydro in the Long-Term Decarbonization Power Source Auction (in units of 10,000 kW)

Auction fiscal yearCategoryContracted capacity (10,000 kW)
FY2023 auctionBattery storage and pumped hydro166.9
FY2024 auctionDuration of 3 hours to under 6 hours96.1
FY2024 auctionDuration of 6 hours or more76.9
FY2025 auctionLithium-ion battery storage and pumped hydro (excluding new builds)81.9
FY2025 auctionNon-lithium-ion battery storage, pumped hydro (new builds) and LDES88.6

Assumptions and terms

How to read the numbers in this issue

Figures across issues

How to cite

You are welcome to quote the figures and charts on this page. Please give the source as follows.

Source: Science X Inc., “Battery Storage Market Notes, October 2026 issue” (updated 2026-11-22), https://www.scix.co.jp/en/research/2026-10

Page: https://www.scix.co.jp/en/research/2026-10 · Updated:

The figures are tallies of published data and our own records. The price spread is a difference in price per kWh and does not show actual revenue. How we compiled them is in the last section, “Assumptions and terms”. Figures across issues are on market data (CSV), and the reuse terms are in the citation guide.

Each month's update also arrives in our LinkedIn newsletter, “Japan grid-scale BESS: primary data”. Subscribe to the newsletter →

Want to see the projects behind these numbers? Visit Chikudensho Market

On Chikudensho Market, our marketplace for battery storage sites, you can browse current listings without registering. Prices and documents are available after free registration, where you agree to a confidentiality undertaking on the registration screen (no signed paper is needed).

Register free to see prices and documents → Browse projects on Chikudensho Market